Alberta Highway 216

From Wikipedia, the free encyclopedia

216
Highway 216
Highway 216
Anthony Henday Drive
Maintained by Alberta Transportation
Beltway around Edmonton
Major
junctions:
Alberta Highway 2, Alberta Highway 14, Whitemud Drive, Yellowhead Trail
Provincial highways in Alberta


Highway 216, also known as Anthony Henday Drive, is the highway designation for the current construction project of a ring road around Edmonton, Alberta. The road is being built within the Transportation and Utilities Corridor, which consists of land owned by the province. The land was purchased though the 1970s and 1980s and encircles the city. More than half of the road is completed, starting at the eastern section from Yellowhead Trail / Highway 16, south to Highway 14, then west to Calgary Trail / Gateway Boulevard / Highway 2, further west and then north to 137 Avenue north of the Yellowhead Trail / Highway 16.

The southeastern section from Calgary Trail / Gateway Boulevard to Highway 14 was completed October 23, 2007. The southeastern section is a public-private partnership (P3 — also known as a design-build-operate project), in which Access Roads won the contract for $493 million to build the road and maintain it for 30 years [1].

On the northern section of Anthony Henday Drive, construction is finished from Highway 16 in the west, north to 137 Ave, where it will meet St. Albert's project of a regional road, bypassing the city to the west. Alberta's Premier, Ed Stelmach, has confirmed that the province wants most of the north leg of the Anthony Henday ring road to be completed by 2011 [2]. Construction of the next leg will run 21 km from the Yellowhead west of 184 Street to Manning Drive (Highway 15). When the north stretch is done, a 9 km gap in the northeast will remain. This final completion of the ring includes a crossing over the North Saskatchewan River, so approvals from Fisheries and Oceans Canada and Transport Canada, as well as intense environmental studies, will be needed.

[edit] Interchanges and Intersections

Eventually the entire route will have freeway status, which means grade separation at all crossings to allow free-flow traffic. This is a list of all the intersections (completed and planned) starting at the eastern intersection of the Anthony Henday and the Yellowhead Trail, heading clockwise.

Direction Intersecting road Current intersection type Planned intersection
North-South 130 Ave none Partial cloverleaf interchange
Yellowhead Trail (Highway 16) Partial cloverleaf interchange Stack interchange
Petroleum Way Flyover
101 Ave / Baseline Road Partial cloverleaf interchange Cloverstack
Sherwood Park Freeway / Wye Road Cloverleaf interchange
Meridin Street At-grade (no crossover)
Whitemud Drive Cloverleaf interchange
38 Ave Flyover
East-West Highway 14 Directional T interchange
17 Street Partial cloverleaf interchange
34 Street Flyover
50 Street Partial cloverleaf interchange
66 Street Flyover
91 Street Partial cloverleaf interchange
Parsons Road Flyover
Highway 2 / Gateway Boulevard Stack interchange
111 Street Diamond interchange
119 Street / 127 Street At-grade (no crossover)
Terwillegar Drive Diamond interchange
South-North Cameron Heights Drive At-grade (northbound traffic lights) unknown
Lessard Road At-grade (traffic lights) Partial cloverleaf interchange
62 Ave / Callingwood Road At-grade (traffic lights) Partial cloverleaf interchange
Whitemud Drive Partial cloverleaf interchange Cloverstack
Webber Greens Drive / 87 Ave Partial cloverleaf interchange
Stony Plain Road / 100 Ave (Highway 16A) At-grade (traffic lights) Partial cloverleaf interchange
109 Ave At-grade Partial cloverleaf interchange
111 Ave At-grade (no crossover)
Yellowhead Trail (Highway 16) Partial cloverleaf interchange Cloverstack
West-East Ray Gibbon Drive / 184 Street At-grade Partial cloverleaf interchange
137 Ave none Diamond interchange
170 Street none Flyover
St. Albert Trail (Highway 2) none Partial cloverleaf interchange
Campbell Road none Diamond interchange
142 Street none Flyover
127 Street none Partial cloverleaf interchange
97 Street (Highway 28) none Partial cloverleaf interchange
82 Street none Flyover
66 Street none Partial cloverleaf interchange
50 Street none Partial cloverleaf interchange
Manning Drive (Highway 15) none Stack interchange
Victoria Trail none Flyover
153 Ave none Partial cloverleaf interchange

[edit] External links

[edit] References