South Eastern Main Line

From Wikipedia, the free encyclopedia

South Eastern Main Line
London Charing Cross
INTa
Hungerford Bridge
WBRÜCKE
River Thames
exSTRrg eABZlg
Waterloo
xINTa BHF
Waterloo East
South Western Main Line
HLUECKE STRrf STR
( Southwark)
eHST
Blackfriars
from Chatham Main Line,
HLUECKE HSTR KRZu ABZ3rg HLUECKE
to Blackfriars
Brighton Main Line
STR STR
and Thameslink line
and Thameslink line
ABZrg STRrf
eABZrg exKDSl
Southwark Depot
Borough Market Junction
ABZld HSTR HLUECKE
to Cannon Street
London Bridge
INTa INT
STR eHST
Spa Road
STR eHST
Southwark Park
ABZld ABZrd
to London Victoria South London Line
HLUECKE ABZrf STR
to East Croydon and Brighton Brighton Main Line
HLUECKE STRrf STR
Bricklayers' Arms
exKDSr eABZlg
ueSTRrg eUKRZo ueHSTR ueHLUECKE
East London Line
Greenwich Line
ueSTR ABZlf HSTR HLUECKE
to Greenwich and
ELL from New Cross Gate
ueHLUECKE uexABZrl eUKRZo uexSTRlg
North Kent Line
CPICl uexCPICre
New Cross
Nunhead to Lewisham link
HLUECKE xABZ3lg eKRZu exHSTR exHLUECKE
Greenwich Park branch
STRlf ABZlg
HST
St Johns
ABZlf STRlg uSTRrg uHLUECKE
DLR to Docklands and the City
STR BHF uKBFe
Lewisham
Hayes Line
HLUECKE KRZo ABZrf
to Beckenham Junction
ABZrg ABZrf
North Kent Line
STR STRlf HLUECKE
to Dartford and
ABZlf STRlg
Bexleyheath Lines
Hither Green
HST HST
Dartford Loop Line
STR STRlf HLUECKE
to Dartford and North Kent Lines
STR KDSa
Hither Green TMD
Dartford Loop Line
ABZrg ABZ3rf HLUECKE
to Dartford and North Kent Lines
STRrg ABZdf STRlg
KDSe STR KDSe
Hither Green Carriage Sidings
ABZlf KDSl
Grove Park Depot
SBRÜCKE
Baring Road (A2212)
HST
Grove Park
Bromley North Line to Bromley North
HLUECKE HSTR ABZrf
TUNNEL1
HST
Elmstead Woods
HST
Chislehurst
Chislehurst Junction
ABZlf STRlg
Chatham Main Line
to London Victoria etc
HLUECKE ABZ3lg KRZo ABZ3lf HLUECKE
Limited Service to Kent Coast
STRlf ABZlg
Petts Wood
HST KDSa
Orpington Carriage Sidings
ABZrg STRrf
BHF
Orpington
HST
Chelsfield
TUNNEL1
HST
Knockholt
Knockholt Tunnel 800 yds
TUNNEL1
and M25
HST
Dunton Green
Westerham Branch
exHLUECKE eABZrf
ABZrg HLUECKE
Sevenoaks via Bat & Ball Line
Sevenoaks
BHF
Formerly Tubbs Hill
TUNNEL1
HST
Hildenborough
to Redhill (old main line)
LUECKE WBRÜCKE
River Medway
ABZlf STRlg STR
STR DST STR
Tonbridge West Yard
STRlf ABZlg STR
Redhill to Tonbridge Line
STRlf ABZlg
BHF
Tonbridge
Hastings Line
HLUECKE ABZrf
Paddock Wood
HST
ABZlf HLUECKE
Medway Valley Line
Hawkhurst branch line
exHLUECKE eABZrf
HST
Marden
HST
Staplehurst
HST
Headcorn
Kent and East Sussex Railway
exHLUECKE eABZrf
Chart Leacon Depot
KDSa HST
Pluckley
STRlf ABZlg
ABZrg HLUECKE
Maidstone East Line
ABZrg HLUECKE
High Speed 1
Ashford International
BHF
Ashford Carriage Sidings
ABZlf KDSl
Ashford to Ramsgate
ABZlf HLUECKE
(via Canterbury West)
ABZlf HLUECKE
High Speed 1
Marshlink Line
HLUECKE ABZrf
STRrg ABZrf
Ashford Depot
KDSe SBRÜCKE
A2070
eHST
Smeeth
Westenhanger
HST
Sandling
HST
Hythe and Sandgate Branch
exHLUECKE eABZrf
ABZlf HSTR STRlg
STR DST
Dollands Moor
Channel Tunnel
HLUECKE KRZt TUNNELru STRrf
eABZrg exHLUECKE
Elham Valley Line
eHST
Cheriton
Folkestone West
HST
Folkestone Harbour
KBFa BHF
Folkestone Central
Folkestone Harbour
WBRÜCKE STR
ABZrg ABZrf
Folkestone Junction
ENDEe eHST
Folkestone East
TUNNEL1
Martello Tunnel 500m
eHST
Folkestone Warren Halt
TUNNEL1
eHST
Shakespeare Cliff Halt
TUNNEL1
Shakespeare Tunnel 1,260m
Dover Marine
exKBFa exSTRrg eABZrf
Admiralty Pier
exBHF exBHF STR
Dover Town
exSTRlf exABZrd STR
exSTRlf eABZrd
TUNNEL1
BHF
Dover Priory
TUNNEL1
to Ramsgate Kent Coast Line
HLUECKE exABZ_rd
Chatham Main Line
LUECKE
Dover Branch

The South Eastern Main Line is one of two long-distance routes crossing the county of Kent, England, UK to reach to Kent Coast. The other route is the Chatham Main Line, which runs along the north Kent coast to Ramsgate and Dover via Chatham.

Contents

[edit] Services

Services on this line take the inland route via Sevenoaks, Ashford and Folkestone to reach Dover.

Stopping services run from London Bridge to Orpington, with other services on the route running fast over this section. Beyond Orpington, stopping services originating from Sevenoaks cover the stations with other services on the rotue running fast over this section

At Tonbridge, the original main route, now the rural Redhill to Tunbridge Wells services join in from Redhill, while the main line to Tunbridge Wells on the Hastings Line diverges.

At Paddock Wood, the Medway Valley Line diverges.

At Ashford, the Swanley to Ashford (via Maidstone East) Line and High Speed 1 joins in, while several lines diverge; Ashford to Ramsgate (via Canterbury West) line, High Speed 1 and Marshlink Line (to Hastings).

Broadly speaking services divide, continuing to Margate via the Ashford to Ramsgate (via Canterbury West) line or they continue on the main line to Dover then takes the Kent Coast Line to rejoin at Ramsgate to reach Margate.

Trains on the routes are run by Southeastern.

[edit] History

The line was built by the South Eastern Railway (SER), who were in competition with the London, Chatham and Dover Railway (LCDR), hence the duplication of stations in Kent.

The original main line was given sanction by Act of Parliament in 1836, running from London Bridge via Croydon East and Redhill (the London, Brighton and South Coast Railway's Brighton Main Line), Tonbridge, and Ashford to Folkestone and Dover. This circuitous route was the result of insistence on the part of Parliament that only one southerly route out of the capital was necessary; forcing the SER to share the LB&SCR's Brighton Main Line. This completely ignored the fact that the main London - Dover road had, since ancient times, followed a much more direct route; and it ignored the fact that the other great railway building projects did take direct routes whenever feasible. A passenger to Dover had a 20-mile longer journey than by the coaching route!

The main line reached Ashford on December 1, 1842; the outskirts of Folkestone by June 28, 1843; and Dover by February 7, 1844. Their locomotive works was built in 1845 moving from New Cross in London.

Due to competition with the LCDR (who had constructed the quicker Chatham Main Line and Swanley to Ashford (via Maidstone East) Line (to Sevenoaks, Canterbury, Dover, Ramsgate, Ashford and Maidstone), the SER built a very expensive line via Sevenoaks and Orpington through the North Downs by means of summits and then long tunnels at both Knockholt and Sevenoaks. This "cut-off" line, 24 miles in length, reached Chislehurst on July 1, 1865, but took three more years to reach Orpington and Sevenoaks (opening date March 2, 1868) and Tonbridge (May 1, 1868).

When the SER and LCDR merged in 1899 to form the South Eastern and Chatham Railway (SECR) the stations and track layout at Ashford and Dover were rationalised.

The line was electrified with third rail, in many stages. Orpington was reached, via Victoria, in July 1925 as part of the "South Eastern Electrification - Stage 1" programme by the newly created Southern Railway, using its standard of 660V DC third rail. In February 1926 the lines from Charing Cross and Cannon Street via London Bridge to Orpington were electrified as part of the "North Kent Electrification" programme. In 1935 with the completion of London urban electrification, Southern expanded its focus to the "outer suburban" routes, with electrification extended to Sevenoaks in January 1935. Postwar, the newly nationalised British Rail started to implement its 1955 BR Modernisation plan. This extended electrification to the Kent Coast in two stages, with the South Eastern Main Line being subject of "Kent Coast Electrification - Stage 2" in June 1961. This was accompanied by a voltage upgrade to 750V DC across the whole the Southern Region of British Railways.

The line was largely left untouched, until the arrival of the Channel Tunnel at Cheriton, near Folkestone. Prior to construction of High Speed 1, services joined the South Eastern Main line and ran to through to Petts Wood, where the route joined the Chatham Main Line into Waterloo International. Freight services for the Channel Tunnel were routed via the Maidstone East Line. The CTRL was built alongside the line to Ashford where is joined in to gain access to the existing station. The CTRL diverges west of Ashford to pursue a separate route to its new London termini (St Pancras). Thus a short section of the line through Ashford is also electrified at 25 kV AC.

[edit] References

[edit] External links

Languages