Nihonkai-Tōhoku Expressway
From Wikipedia, the free encyclopedia
| This article contains information about a planned or expected future road. It may contain information of a speculative nature and the content may change as the road's construction or completion approaches and more information becomes available. |
| Nihonkai-Tōhoku Expressway (日本海東北自動車道) |
|
| Length: | 53.6 km (tolled sections)[1] |
|---|---|
| Formed: | 2001 |
| From: | Niigata-Chūō Junction in Niigata, Niigata |
| To: | Kawabe Junction in Akita, Akita |
| Major cities: | Shibata, Tainai, Tsuruoka, Sakata, Nikaho, Yurihonjō |
The Nihonkai-Tōhoku Expressway (日本海東北自動車道 Nihonkai Tōhoku Jidōsha-dō?) is a national expressway in Japan. It is owned and operated by East Nippon Expressway Company.
Contents |
[edit] Naming
The course of the expressway takes it alongside the coastline of the Japan Sea (Nihonkai) in the Tōhoku region of Japan.
The Nihonkai-Tōhoku Expressway is the operating name for the sections of the Nihonkai Engan Tōhoku Expressway that are operated by East Nippon Expressway Company. The Nihonkai Engan Tōhoku Expressway is an official designation consisting of several routes that link Niigata with Aomori via Yamagata and Akita[2], reaching a total of approximately 322 km.[3]
[edit] Overview
The first section of the expressway was opened to traffic in 2001. As of March 2008 the expressway incomplete in many areas. The next section is scheduled to open in 2009 (Nakajō Interchange to Arakawa Interchange)[4] to coincide with the National Sports Festival which is planned to be held in Niigata that year. After this, all future sections will be built according to the New Direct Control System, whereby the burden for construction costs will be shared by the national and local governments and no tolls will be collected. Currently the section between Honjō Interchange and Iwaki Interchange operates according to this principle.[5]
The expressway is 4 lanes from Niigata-Chūō Junction to Toyosaka Service Area, and 2 lanes for all remaining sections.
The route parallels the Uetsu Main Line of East Japan Railway Company and National Route 7 for much of its length.
[edit] List of interchanges and features
- IC - interchange, SIC - smart interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, TB - toll gate, BR - bridge, TN - tunnel
[edit] Niigata - Yamagata section
| No. | Name | Connections | Dist. from Origin |
Dist. from Terminus |
Bus Stop | Notes | Location | |
|---|---|---|---|---|---|---|---|---|
| Through to |
||||||||
| (42) | Niigata-Chūō JCT | 0.0 | 36.9 | Kōnan-ku, Niigata | Niigata | |||
| 1[43] | Niigata-Kameda IC | 3.2 | 33.7 | |||||
| BS | Nishino Bus Stop | 7.4 | 29.5 | ○ | ||||
| 2[44] | Niigata Airport IC | Pref. Route 16 (Niigata Kameda Uchino Route) | 9.2 | 27.7 | ||||
| SA | Toyosaka SA/SIC | 11.7 | 25.2 | SIC: Nakajō-bound exit, Niigata-bound entrance only | Kita-ku, Niigata | |||
| BS | Kuzutsuka Bus Stop | 16.6 | 20.3 | ○ | ||||
| 3 | Toyosaka- Niigatahigashikō IC |
Pref. Route 46 (Niigata Ōsoto Kanjō Route) | 18.3 | 18.6 | ||||
| 4 | Seirō Shibata IC | 25.7 | 11.2 | ○ | Seirō | |||
| BS | Kajikawa-Shiunji Bus Stop | 31.6 | 5.3 | ○ | Shibata | |||
| 5 | Nakajō IC | Pref. Route 591 (Nakajō Inter Route) | 36.9 | 0.0 | Tainai | |||
| <TB> | Nakajō Toll Gate | Planned | ||||||
| <6> | Arakawa IC | Opens in 2009 | Arakawa | |||||
| <PA> | Arakawa PA | Planned | ||||||
| <7> | Murakami IC | Planned | Kamihayashi | |||||
| <8> | Asahi IC | Pref. Route 208 (Koage Sarusawa Route) | Planned | Asahi | ||||
| <9> | Sanpoku IC | Planned | Sanpoku | |||||
| <10> | Atsumi IC | Opens in 2011 | Tsuruoka | Yamagata | ||||
| <11> | Sanzei IC | Opens in 2011 Atsumi-bound exit, Tsuruoka-bound entrance only |
||||||
| <13> | Tsuruoka JCT | ↓ | ↑ | Opens in 2011 | ||||
[edit] Akita section
| No. | Name | Connections | Dist. from Origin |
Dist. from Terminus |
Bus Stop | Notes | Location (all in Akita) |
|---|---|---|---|---|---|---|---|
| Through to |
|||||||
| 14 | Honjō IC | 0.0 | 38.4 | Yurihonjō | |||
| 14-1 | Ōuchi JCT | 9.2 | 29.2 | ||||
| 14-2 | Matsugasaki-Kameda IC | 16.1 | 22.3 | ||||
| TN | Futago Tunnel | ↓ | ↑ | ||||
| 15 | Iwaki IC | Pref. Route 44 (Yūwa Iwaki Route) | 21.6 | 16.8 | |||
| TB | Akita Airport Toll Gate | 35.5 | 2.9 | Akita | |||
| 16 | Akita Airport IC | Pref. Route 61 (Akita Goshono Yūwa Route) | 35.9 | 2.5 | |||
| (5-1) | Kawabe JCT | 38.4 | 0.0 | ||||
[edit] References
- ^ E-NEXCO Expressway Data. Retrieved on 2008-04-13.
- ^ Ministry of Land, Infrastructure and Transport. High Standard Trunk Road Map (pdf). Retrieved on 2008-04-13.
- ^ Ministry of Land, Infrastructure and Transport. Nihonkai Engan Tohoku Expressway Construction Status. Retrieved on 2008-04-17.
- ^ E-NEXCO Opening Schedule. Retrieved on 2008-04-15.
- ^ Ministry of Land, Infrastructure and Transport. Nihonkai Engan Tohoku Expressway Construction Status. Retrieved on 2008-04-17.
[edit] External links
- (Japanese) East Nippon Expressway Company
|
||||||||
|
|||||||||||||||||

