Interstate 170
From Wikipedia, the free encyclopedia
| Interstate 170 Auxiliary route of the Interstate Highway System |
|||||||||||||
| Maintained by MoDOT | |||||||||||||
| Length: | 11.17 mi[1] (17.98 km) | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| South end: | |||||||||||||
| Major junctions: |
|||||||||||||
| North end: | |||||||||||||
|
|||||||||||||
Interstate 170 (abbreviated I-170) is the designation for an interstate route in the St. Louis, Missouri metropolitan area. I-170, also known as the Inner Belt Expressway, is an 11.17 mile highway traveling north-south through the St. Louis suburbs of Hazelwood, Berkeley, St. John, Charlack, Vinita Park, Sycamore Hills, Bel-Ridge, Olivette,Overland, University City, Ladue, Clayton, and Richmond Heights, ending just north of the city of Brentwood.
I-170 connects to Interstate 270 at its northern terminus and Interstate 64 at its southern terminus; at exits 7A and 7B, I-170 crosses its parent, I-70. Interstate 170 also provides access to Lambert-St. Louis International Airport.
Contents |
History
I-170 was originally intended to provide an inner beltway within I-270 through St. Louis County extending to I-55 in the South County area; however, the portion of the route south of I-64/US 40 was cancelled due to local opposition. The portion of MetroLink's Cross County Extension south of I-64 runs roughly along the proposed alignment.
The southern portion of I-170 was built using St. Louis County funds in the 1960s. It was signed as Route 725.
Future
The southern two interchanges on I-170 (at I-64/US 40 and Galleria Parkway) are being reconstructed as part of the New I-64 project. Most notably, the new interchange will include direct access to I-170 from eastbound I-64; however, access to Galleria Parkway from northbound I-170 will be eliminated.[2]
Exit list
| County | Municipality | Mile[3] | # | Destinations | Notes |
|---|---|---|---|---|---|
| St. Louis | Richmond Heights | 0.00 | Eager Road / Brentwood Boulevard – Brentwood Promenade Court | ||
| 0.00 | 1A | Southbound only | |||
| 0.00 | 1B | Southbound only | |||
| Clayton | 0.84 | 1D | Brentwood Boulevard south | Southbound only | |
| 1.12 | 1E | Forest Park Parkway | |||
| 1.55 | 1F | Ladue Road | |||
| 2.22 | 2 | Delmar Boulevard | |||
| University City | 3.39 | 3 | |||
| Overland | 4.15 | 4 | |||
| Charlack | 5.65 | 5 | |||
| St. John | 6.61 | 6 | |||
| Berkeley | 7.43 | 7A | |||
| 7.60 | 7B | ||||
| 7.68 | 7C | Lambert-St. Louis Airport | Northbound only | ||
| 8.42 | 8 | North Hanley Road / Scudder Road | |||
| 8.83 | 9A | Airport Road | |||
| 9.08 | 9B | Boeing Plant | Northbound only | ||
| 9.61 | 9C | North Hanley Road | Northbound only | ||
| Hazelwood | 10.58 | 10A | Northbound only | ||
| 10.58 | 10B | Northbound only |
References
- ^ Route Log - Auxiliary Routes of the Eisenhower National System Of Interstate and Defense Highways - Table 2
- ^ Project Overview. The New I-64. Missouri Department of Transportation. Retrieved on 2007-05-28.
- ^ DeLorme Street Atlas USA 2007, Toggle Measure Tool
External links
|
|||||||

