User:SatyrBot/Project log 8

From Wikipedia, the free encyclopedia

Archive This is a log of operations by a botUser:SatyrBot. The contents of this page are unlikely to need human editing. In particular, links should not be disambiguated as this is a historical record.
SatyrBot Project ListCurrent project

Page 7 | Page 8 | Page 9

Finished current project. Reviewed 30 categories; skipped 219 articles; added 119 tags.
  • Adding template to Talk:Gabriel Vasquez
  • Adding template to Talk:Felix, Bishop of Urgel
Skipping El Corte Inglés
El Corte Inglés already has {{WikiProject Spain}}
  • Adding template to Talk:Martin Varsavsky
  • Adding template to Talk:Facundo Bacardi
  • Adding template to Talk:Terra (company)
  • Adding template to Talk:Indra sistemas
  • Adding template to Talk:Iberian logistics
  • Adding template to Talk:Almirall Prodesfarma
Skipping SCORE (Spain)
SCORE (Spain) already has {{WikiProject Spain}}
Skipping Diario Marca
Diario Marca already has {{WikiProject Spain}}
Skipping Diario AS
Diario AS already has {{WikiProject Spain}}
Skipping Don Balón
Don Balón already has {{WikiProject Spain}}
Skipping Wilebaldo Solano
Wilebaldo Solano already has {{WikiProject Spain}}
Skipping Wenceslao Fernández Flórez
Wenceslao Fernández Flórez already has {{WikiProject Spain}}
  • Finished Category:Heads of state in Spain
  • Skipping 1 pages due to pre-sort.
  • There are 1 pages in Category:Heads of state in Spain.
  • Working on Category:Heads of state in Spain
Starting current project. Current delay is 10
  • Adding template to Talk:Juan Valera y Alcala Galiano
  • Adding template to Talk:Jose Clavijo y Fajardo
Skipping Carlos Arias Navarro
Carlos Arias Navarro already has {{WikiProject Spain}}
  • Finished Category:Heads of state in Spain
  • Skipping 1 pages due to pre-sort.
  • There are 1 pages in Category:Heads of state in Spain.
  • Working on Category:Heads of state in Spain
Skipping Fernando Villaamil
Fernando Villaamil already has {{WikiProject Spain}}
  • Adding template to Talk:Alvaro de Bazán (F101)
Starting current project. Current delay is 10

Logs for current project. See User:SatyrBot/Project list for a list of previous projects and logs.