From Wikipedia, the free encyclopedia
Interstate 391 (abbreviated I-391) runs from the I-91/I-391 interchange in Chicopee to the center of Holyoke, a distance of about 4.86 mi (7.82 km). It runs near the Connecticut River throughout its journey in Chicopee, and crosses into Holyoke and abruptly ends at High Street 0.4 miles south of U.S. Route 202.[1]
[edit] Route description
Interstate 391 begins at an interchange with I-91 (at Exit 12) in southern Chicopee, just north of the Atwater Park and the Calvary Cemetery. Initially running parallel to the Connecticut River, it intersects with Route 116 in Chicopee center and crosses the Chicopee River. I-391 then has another junction with Route 116 in the Sandy Hill section of town, and in less than one mile, it intersects the Massachusetts Turnpike without an interchange. I-391 continues north through the rest of northen Chicopee, intersecting Route 141 along the way and then passing just east of Rivers Park. I-391 then crosses the Connecticut River into the town of Holyoke, where it has two closely-spaced exits for local streets in the the town. I-391 officially comes to an end at High Street in Holyoke, with the road continuing as Resnic Boulevard, which connects to US 202 after 0.4 miles.[2]
[edit] History
Plans for the highway originated from the Master Highway Plan for the Springfield Metropolitan Area in 1953, which planned for a "major street improvement" to Route 116. By the 1960s, freeway access was needed between Chicopee and Holyoke to improve traffic flow which promted a spur route of Interstate 91 to be built. I-391's planned six lanes were built to handle up to 50,000 vehicles every day, and the total cost of the proposed highway was estimated at about $35 million dollars. In 1965, an alignment of the highway had been set, along with two alternative alignments. Construction for Interstate 391 began in 1967 with a short 0.75 mi (1.21 km) long highway, which was completed in 1970. After years of haulted progress, construction started again in 1978. The highway was completed in 1982 after about 15 years of planning and construction.[3]
[edit] Exit list
[edit] External links
[edit] References