Talk:Toronto/Buttonville Municipal Airport

From Wikipedia, the free encyclopedia

This is the talk page for discussing improvements to the Toronto/Buttonville Municipal Airport article.

Article policies
AVIATION This article is within the scope of the Aviation WikiProject. If you would like to participate, please visit the project page, where you can join the project and see lists of open tasks and task forces. To use this banner, please see the full instructions.
Start This article has been rated as Start-Class on the quality scale.


[edit] Broken Link! (7 Future Section)

I found a new link for the broken link to the GTAA Planning Document .pdf file at the bottom of the page, but I am not sure if the page number references still apply. It looks like the version I found is just a lower resolution pdf than the one originally cited; I can't be sure though, since I can't find the original document.

old link: http://www.gtaa.com/%5CDocuments%5Ccorporate%5CPickeringAirportDraftPlanReportHiRes.pdf

new link: http://www.gtaa.com/local/files/en/PickeringAirportDraftPlanReport.pdf

Can anyone tell me if there is a way to tell who originally added those references? Maybe that person would be able to find the new page numbers to go with the new link?

If not, here is an example of the problem I had relating the new document to the old one without the old one as a reference. For example, the wiki article currently cites page 6, but the pages on the new version are numbered i, ii, iii, not including the title page until chapter 1 begins, at which point they are numbered 1:1, 1:2, 1:3.. until chapter 2, where they are 2:1, 2:2, etc.. Page 1:6 is blank. There is no page vi (6) in the intro section, however if you begin numbering at page 1, as Adobe pdf reader does, page 6 corresponds to page v of the document, which is titled "Foreword," not a blank page.

Anyway, I'm not really a pro at this, so any suggestions would be appreciated. Jalirpa (talk) 14:59, 25 February 2008 (UTC)