User:Theanphibian/conversion tool

From Wikipedia, the free encyclopedia

This is the user page of my foreign Infobox conversion tool. Format:

==[[Dam page]]==

  • English Japan dam template
  • Raw template from other language Wikipedia

Process:

  1. Copy the wikicode for the desired infobox into new section for the article you want but replace the template name with User:Theanphibian/a.
  2. Preview this page. Copy the text produced by the /a template and paste it at the beginning of your section and (after tidying up) save this page.
  3. You're done, copy the wikicode to your article.

Contents

[edit] Tokuyama Dam

Theanphibian/conversion tool
Tokuyama Dam
Location
Left side:Ibigawa, Gifu, Higashisuibara

Right side:Ibigawa, Gifu Higashisuibara

Coordinates 35° 39 55° N
river(s) Kiso River-Ibi River
Lake of the dam To be named
Dam Type Rock fill dam
Numerical Characteristics
Height 161.0 m
Length 427.1 m
Dam volume 13,700,000
Reservoir Volume 660,000,000 m³
Utilized Volume 380,400,000 m³
River basin area 254.5 km²
Reservoir area 1,300.0 ha
Dam use Flood Control・Irrigation

Waterworks・Industry・Power

Owner EPDC

→Ministry of Construction
Chubu Office
→Japan Water Agency

Operator EPDC

→Chubu Electric

Electric Generators
(Output)
Tokuyama generator

(153,000kW)

Construction Company Kumagai Gumi

Taisei Corporation
Asunaro Aoki Construction

Construction start/end 1971/2008
Notes    350 billion yen total cost
■Template■Talk ■Info■WP:E


{{User:Theanphibian/new version
| picture = image:Tokuyama-958-r1.JPG
| address = Left side:Ibigawa, Gifu, Higashisuibara
Right side:Ibigawa, Gifu Higashisuibara
| coordinate = 35° 39 55° N
| rivers = Kiso River-Ibi River
| lake = To be named
| type = Rock fill dam
<!-- Numbers -->
| height = 161.0
| length = 427.1
| dam_volume = 13,700,000
| capacity_volume = 660,000,000
| storage_volume = 380,400,000
| catchment_area = 254.5
| inundation_area = 1,300.0
| utilization = Flood ControlIrrigation
Waterworks・Industry・Power
| owner = EPDC
Ministry of Construction
Chubu Office
→Japan Water Agency
| utility = EPDC
Chubu Electric
| generators = Tokuyama generator
(153,000kW
| construction = Kumagai Gumi
Taisei Corporation
Asunaro Aoki Construction
| started = 1971
| finished = 2008
| notes =   350 billion yen total cost
}}



[edit] Arimine Dam

Theanphibian/conversion tool
Image:Arimine Dam survey.jpg
Location
Right river bank:Toyama, Toyama, Arimine
Left river bank:Toyama, Toyama, Arimine
Coordinates 36° 29 22° N
river(s) Joganji river, Wada river
Lake of the dam Arimine Lake
Dam Type Concrete Gravity Dam
Numerical Characteristics
Height 140.0 m
Length 500.0 m
Dam volume 1,568,000
Reservoir Volume 222,000,000 m³
Utilized Volume 204,000,000 m³
River basin area 220.0 km²
Reservoir area 512.0 ha
Dam use Hydroelectricity
Owner Hokuriku Electric
Operator Hokuriku Electric
Electric Generators
(Output)
Wada I
(27,000kW)
Wada II
(122,000kW)
Arine I
(265,000kW)
Construction Company Maeda Corporation
Construction start/end 1956/1959
Notes
■Template■Talk ■Info■WP:E

[edit] Miyama Dam

{{User:Theanphibian/new version
| picture = image:Miyama-568-r1.jpg
| address = 左岸:栃木県那須塩原市百村字深山
右岸:栃木県那須塩原市百村字深山
| coordinate = Template:ウィキ座標2段度分秒
| rivers = 那珂川水系那珂川
| lake = 深山湖
| type = アスファルトフェイシングフィルダム
<!-- Numbers -->
| height = 75.5
| length = 333.8
| dam_volume = 1,967,000
| capacity_volume = 25,800,000
| storage_volume = 20,900,000
| catchment_area = 66.4
| inundation_area = 97.0
| utilization = 灌漑・上水道・発電
| owner = 農林省関東農政局
→栃木県
| utility = 電源開発
(沼原発電所)
栃木県企業局
(板室発電所)
| generators = 沼原発電所
(675,000kW)
板室発電所
(16,100kW)
| construction = 大林組
| started = 1968年
| finished = 1973年
| notes = 
}}



[edit] Okutadami Dam

Theanphibian/conversion tool
Image:Okutadamidam-0A3N80pbxFs6g.JPG
Location
左岸:新潟県魚沼市湯之谷芋川

右岸:福島県南会津郡桧枝岐村駒嶽

Coordinates Template:ウィキ座標2段度分秒
river(s) 阿賀野川水系只見川
Lake of the dam 奥只見湖

(ダム湖百選)

Dam Type 重力式コンクリートダム
Numerical Characteristics
Height 157.0 m
Length 480.0 m
Dam volume 1,636,000
Reservoir Volume 601,000,000 m³
Utilized Volume 458,000,000 m³
River basin area 595.1 km²
Reservoir area 1,150.0 ha
Dam use 発電
Owner 電源開発
Operator 電源開発
Electric Generators
(Output)
奥只見発電所

(560,000kW)
奥只見(維持流量)発電所 (2,700kW)

Construction Company 鹿島建設
Construction start/end 1953/1960
Notes  
■Template■Talk ■Info■WP:E


{{User:Theanphibian/new version
| picture = [[image:Okutadamidam-0A3N80pbxFs6g.JPG|300px|Okutadami dam]]
| address = 左岸:新潟県魚沼市湯之谷芋川
右岸:福島県南会津郡桧枝岐村駒嶽
| coordinate = Template:ウィキ座標2段度分秒
| rivers = 阿賀野川水系只見川
| lake = 奥只見湖
(ダム湖百選)
| type = 重力式コンクリートダム
<!-- Numbers -->
| height = 157.0
| length = 480.0
| dam_volume = 1,636,000
| capacity_volume = 601,000,000
| storage_volume = 458,000,000
| catchment_area = 595.1
| inundation_area = 1,150.0
| utilization = 発電
| owner = 電源開発
| utility = 電源開発
| generators = 奥只見発電所
(560,000kW)
奥只見(維持流量)発電所
(2,700kW)
| construction = 鹿島建設
| started = 1953
| finished = 1960
| notes = 
}}



[edit] Minamiaiki Dam

Theanphibian/conversion tool
Minamiaki Dam
Location
Minamiaiki, Nagano National Forest
Coordinates 36°00′16″N, 138°39′13″E
river(s) Shinano River tributaries Aiki
and Minamiaiki rivers
Lake of the dam Okusan Lake
Dam type Rock fill dam
Numerical characteristics
Height 136.0
Length 444.0
Dam volume 7,300,000
Reservoir volume 19,170,000
Utilized volume 12,670,000
River basin area 6.2
Reservoir area 59.0
Dam use hydroelectricity
Owner Tepco
Operator Tepco
Electric generators
(Output)
Kanagawa river
generating station

(2,820,000kW:planned)

Construction company Maeda Corporation
Taisei Corporation
Obayashi Corp.
Asunaro Aoki Construction
Construction start/end 1995/2005
Notes  
■Template■Talk ■Info■WP:E


{{User:Theanphibian/new version
| picture = [[image:Minamiaiki Dam.jpg|center|300px|南相木ダム]]
| address = 長野県南佐久郡南相木村南相木国有林地先
| coordinate = Template:ウィキ座標2段度分秒
| rivers = 信濃川水系相木川左支
南相木川(三川)
| lake = 奥三川湖
| type = 中央土質遮水壁型
ロックフィルダム
<!-- Numbers -->
| height = 136.0
| length = 444.0
| dam_volume = 7,300,000
| capacity_volume = 19,170,000
| storage_volume = 12,670,000
| catchment_area = 6.2
| inundation_area = 59.0
| utilization = 発電
| owner = 東京電力
| utility = 東京電力
| generators = 神流川発電所
(2,820,000kW:予定)
| construction = 前田建設工業
大成建設
大林組
青木あすなろ建設
| started = 1995年
| finished = 2005年
| notes = 
}}



[edit] Ueno Dam

Theanphibian/conversion tool
上野ダム
Location
The greater valley of Ueno, Gunma
Coordinates 36°03′11″N, 138°42′16″E
river(s) 利根川水系烏川右支神流川
Lake of the dam 奥神流湖
Dam Type 重力式コンクリートダム
Numerical Characteristics
Height 120.0 m
Length 350.0 m
Dam volume 720,000
Reservoir Volume 18,400,000 m³
Utilized Volume 12,670,000 m³
River basin area 31.2 km²
Reservoir area 56.0 ha
Dam use 発電
Owner 東京電力
Operator 東京電力
Electric Generators
(Output)
神流川発電所

(2,820,000kW:予定)

Construction Company ハザマ・飛島建設・

日本国土開発・戸田建設

Construction start/end 1995/2005
Notes  
■Template■Talk ■Info■WP:E


{{User:Theanphibian/new version
| picture = [[image:Ueno-3281-r1.jpg|300px|上野ダム]]
| address = 左岸:群馬県多野郡上野村大字楢原字本谷
右岸:群馬県多野郡上野村大字楢原字本谷
| coordinate = Template:ウィキ座標2段度分秒
| rivers = 利根川水系烏川右支神流川
| lake = 奥神流湖
| type = 重力式コンクリートダム
<!-- Numbers -->
| height = 120.0
| length = 350.0
| dam_volume = 720,000
| capacity_volume = 18,400,000
| storage_volume = 12,670,000
| catchment_area = 31.2
| inundation_area = 56.0
| utilization = 発電
| owner = 東京電力
| utility = 東京電力
| generators = 神流川発電所
(2,820,000kW:予定)
| construction = ハザマ・飛島建設・
日本国土開発・戸田建設
| started = 1995年
| finished = 2005年
| notes = 
}}