Sequence step algorithm

From Wikipedia, the free encyclopedia

The Sequence Step Algorithm (SQS-AL) is an algorithm implemented in discrete event simulation system to maximize resource utlization.

It uses sequence step which is a drawing concept in activity-on-node network to orderly determine repetitive activity start date. This is achieved by first selecting a desire confdetermining the distribution of resoure idle time . The determine repetitive activity start date. the problem of probabilistic repetitive project scheduling.

[edit] Further reading

[edit] See also

  • Linear Scheduling Method
  • Repetitive Scheduling Method
  • Time-Location Based Scheduling Method