Image:S7 BWH26-5-03A.JPG

From Wikipedia, the free encyclopedia

[edit] Summary

This is a northerly view of Rhyd Ddu station in the final stages of construction on 26/5/03. Diesel loco Conway Castle hauls a PW train with a tamping machine in the background. In April 2006, the platform was doubled in length to the south and given two faces in preparation for the planned 2009 opening of the through route to Porthmadog. B.W.Hughes

[edit] Licensing

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current09:40, 13 April 2006640×480 (70 KB)Barrie Hughes (Talk | contribs) (Rhyd Ddu station in the final stages of construction on 26/5/03. Diesel loco Conway Castle hauls a PW train. B.W.Hughes)

The following pages on the English Wikipedia link to this file (pages on other projects are not listed):