Talk:Passing loop

From Wikipedia, the free encyclopedia

This article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to rail transport on Wikipedia. If you would like to participate, you can visit the project page, where you can join the project and/or contribute to the discussion.
See also: WikiProject Trains to do list
Start This article has been rated as start-Class on the quality scale. (assessment comments)
??? This article has not yet received a rating on the importance scale within the Trains WikiProject.

[edit] See-sawing

If both trains are too long for the loop, time-consuming "see-sawing" operations are required for the trains to cross.

It's my understanding that this passing maneuver is also called a "double saw-by." It's probably best avoided if at all possible, even if that means a train has to wait for some time at a longer passing loop. 4.243.206.245 05:31, 13 February 2007 (UTC)

A description of how it is accomplished would be useful. 20.133.0.14 14:29, 22 August 2007 (UTC)