OnTrack

From Wikipedia, the free encyclopedia

This article is about the New York commuter train line. For the New Zealand company, see ONTRACK.
OnTrack
Logo
Locale Syracuse, New York
Dates of operation 19942007
Track gauge ft 8½ in (1435 mm) (standard gauge)
Headquarters Syracuse, NY
Route Diagram
uexKBFa
Central New York Regional Market
ueLUECKE
Alliance Bank Stadium
ueBHF
Walsh Transportation Center
uBHF
Carousel Center
uHST
600 Erie Place (flag stop)
uBHF
Armory Square
uBHF
Syracuse University
ueHST
Colvin Street (flag stop)
ueHST
Rock Cut Road (seasonal flag stop)
ueHST
Jamesville Village
uexHSTe
Jamesville Beach (seasonal)

OnTrack was a Syracuse, New York Regional rail line. During its operation, Syracuse was the smallest city in the United States to have regional train service. The line ran from Colvin Street on the city's south side via Syracuse University and Armory Square to the Carousel Center, using three Budd Rail Diesel Cars that were built in the 1950s. There was also a flag stop called 600 Erie Place, and seasonal service to Jamesville. Financing was approved in April 2004 to build a bridge that would allow OnTrack to reach the William F. Walsh Regional Transportation Center, Regional Market, and Alliance Bank Stadium. These stations have already been built, and most of the track has been laid, with simply the bridge link missing.

When service began in 1994, the trains ran between Syracuse University, Armory Square and Carousel Center 10 times a day, seven days a week. In 2005, service was limited to only Saturdays. The fare was $1.50.

OnTrack was heavily subsidized with roughly 8 million dollars of state money spent on the system. In order to be profitable, OnTrack needed 500 riders a day; at its height it received only 75. In July 2007, OnTrack ended service indefinitely. It is not yet known whether service will be resumed in the future (or what form resumed service might take).

Ambitious plans for the future of OnTrack included:

  • Completion of the bridge mentioned above that would have made the line much more useful as many people arrive in Syracuse through the Transportation Center and may need public transportation to travel further into the city. This plan was plagued by construction problems.
  • Increased ridership from the long overdue construction of Destiny USA, a multi-billion dollar tourism attraction, which is supposed to draw millions of tourists a year.
  • Increased ridership as a result of more strategically-placed stations. All but one of the stations, Colvin Street, were in non-residential neighborhoods, although the line ran through several residential areas. [However, the Colvin Street station itself mostly failed to attract ridership. This could be attributed to OnTrack's operating hours, which did not include morning rush hour service.]

OnTrack also ran the "Orange Express" shuttle during Syracuse University Carrier Dome events. This shuttle was more successful.

OnTrack was the subject of criticism for failing to re-paint its railroad bridges over Erie Boulevard and South Geddes, West Fayette and West Genesee Streets. Congressman Jim Walsh appropriated $3 million in 2002 for Ontrack, although the company insisted the money was earmarked for structural rather than cosmetic improvements. [1]

[edit] Stops

From north to south:

Stations planned for an expanded Salvation Army facility downtown were cancelled when the Syracuse Salvation Army received word in January 2006 that they had not been selected as one of the recipients of a grant from the Kroc Foundation, run by Joan B. Kroc. The foundation had donated $1.6 billion to be used for 48 new community centers nationwide. The grant proposal had requested $36 million for a facility offering recreation, arts, education and work force development.