Modular BOM
From Wikipedia, the free encyclopedia
Modular Bill of Material (BOM) is a critical element in defining the product structure of an end-item.
Modular BOMs define the component materials, documents, parts and engineering drawings needed to complete a sub-assembly. While the term BOM and Modular BOM are most commonly used in association with physical products, the concept can be used in a variety of industries (software, medical records, etc.) Modular BOMs are used by modern information systems to serve a variety of purposes, they define the components needed to produce a subassembly, they provide cost information for each component and "rolled-up" cost for the overall subassembly,
For option-based, configurable products (think automobiles, PC's, etc.) companies needed to plan every combination and permutation of options to ensure they could fulfill customer demands. With a modular BOM structure, companies can plan the demand for each module independent of the end-item demand by estimating the popularity of the module sub-assembly.
[edit] See also
- Bill of Materials
- Configurable BOM
- Material requirements planning (MRP)
- Manufacturing resource planning (MRP II)
- Enterprise resource planning (ERP)
- Product Data Management (PDM)
[edit] References
| This article needs additional citations for verification. Please help improve this article by adding reliable references. Unsourced material may be challenged and removed. (June 2007) |

