Los Teques Metro

From Wikipedia, the free encyclopedia

Los Teques Metro
Locale Los Teques
Transit type Rapid transit
Began operation November 3, 2006
System length 9.5 km (5.9 mi)
Number of lines 1
Number of stations 2
Track gauge 1,435 mm (4 ft 8½ in) (standard gauge)
Operator(s) Compañía Anónima Metro Los Teques

The Los Teques Metro is a suburban mass-transit system that is being built in the city of Los Teques, Venezuela with connections to important surrounding cities and communities. It was opened to public service on November 3, 2006.

Presently, the system connects the city with Caracas. It is adscribed to the Venezuelan government and the Ministry of Infrastructure. The government of Miranda State and the mayorship of the Guaicaipuro Municipality are also financing its development.

Los Teques Metro
Los Teques Metro

In its actual (first) stage, it runs for 9.5 km (6 miles) parallel to the San Pedro River, establishing a link between Las Adjuntas station 900 meters above sea level to the Alí Primera (formerly El Tambor) station 1300 meters above sea level in Los Teques, with a fifteen minutes travel calculated in between, and no intermediate stops.

Presently, Los Teques Metro only operates between these 2 stations, however, additional stations are now under construction.

Contents

[edit] History

The subway plans date back to 1982, when it was first proposed. However, it wouldn't be until October 19, 1998 when the C.A. Metro Los Teques transit corporation was created in order to carry out management, administrative duties and civil works related to the project. It was supposed to alleviate the congestion of the Panamerican Highway and ease commuting between the two cities, because of their proximity.

Construction for the first phase began in 2001 with works including the cannalization of the San Pedro River, the tunneling and building of the bridges until reaching Las Adjuntas. It is estimated that the project cost was about 800 million US dollars.

The metro system began with restricted operations:

  • 1 railway through a single tunnel;
  • 1 or 2 trains;
  • Monday to Friday service between 5:15 a.m. and 9:00 a.m., and later from 5:00 p.m. to 11:00 p.m.;
  • limited weekend service,

on November 3, 2006.

[edit] Operations

The second rail within the same tunnel was formally inaugurated October 22, 2007. Trial and testing period continued with additional trains and full 7 day service from 5:10 a.m. till 11:00 p.m. implemented on November 19, 2007.

The ride between Las Adjuntas and Alí Primera as of January 2, 2007 is 1,500 bolívares (1.5 bolívares fuertes, 75 US cents) for a one way ride and the price includes a subway ride within the Caracas Metro network.

Type Coverage Fare Notes
Subway One Way One ride to or from Los Teques to any Caracas Metro station 1,500 bolívares (1.5 bolívares fuertes, 0.72 USD) Valid for all Caracas Metro stations
Return Trip 2 rides 2,900 bolívares (Bs.F 2.9, 1.38 USD) same as above
Multi-Abono 10 rides 14,000 bolívares (Bs.F 14, 6.20 USD) Available at all Caracas Metro stations or on departure from Alí Primera
Student Multi-Abono 10 rides 9,000 bolívares (Bs.F 9, 4.10 USD) Available at some Caracas Metro stations: Maternidad; Caño Amarillo; Parque del Este; El Silencio and Caricuao.

[edit] Future expansion

Construction of the extension formally started March 20, 2007. This extension known as Line 2 to the system will be 12 km (7.5 miles) with 3 new stations within the city, 2 in nearby communities and finally terminating in San Antonio de Los Altos with the central Los Teques stations opening in 2010 and 100% completion is expected by 2012.

Line 2 adds six stations that are currently under construction are:

  • La Hoyada, Guaicaipuro inauguration for 2010
  • Independencia, Miranda inauguration for 2010
  • Los Cerritos
  • Carrizal
  • Las Minas
  • San Antonio

Line 3 has been proposed 18.5 km (12 miles) to be awarded by 2010 and completed by 2015. It will commence from San Antonio and connect some communities before looping towards the La Rinconada Caracas Metro Station.

  • La Morita
  • San Diego
  • Potrerito
  • La Mariposa
  • La Rinconada

[edit] Lines

Line Station Station Length Status
1 Las Adjuntas Alí Primera 9.5 km everyday service
2 Alí Primera Guaicaipuro 0.7 km under construction, for service in 2010
Guaicaipuro Miranda 1.0 km under construction, for service in 2010
Miranda Los Cerritos 1.7 km under construction, for service in 2012
Los Cerritos Carrizal 1.7 km under construction, for service in 2012
Carrizal Las Minas 4.3 km under construction, for service in 2012
Las Minas San Antonio 2.5 km under construction, for service in 2012
3 San Antonio La Morita 1.5 km planning
La Morita San Diego 1.6 km planning
San Diego Potrerito 4.9 km planning
Potrerito La Mariposa 3.0 km planning
La Mariposa La Rinconada 7.5 km planning

[edit] See also

[edit] External links


Urban Rail Systems in Venezuela

Caracas Metro | Guarenas / Guatire Metro | Los Teques Metro | Maracaibo Metro | Valencia Metro

Wikimedia Commons has media related to:
The main article for this category is Electric vehicles.
See also: Battery electric vehicle
See also: Category:Historic electric vehicles
See also: Category:Former production electric vehicles
See also: Category:Production electric vehicles
See also: Category:Prototype electric vehicles
See also: Category:Electric buses
See also: Category:Electric trucks
See also: Category:Solar vehicles