Line 3 Red (Montreal Metro)

From Wikipedia, the free encyclopedia

In the Montreal Metro, Line 3 was a line that never made it past its planning stage. The line was planned to have 15 stations and end at Cartierville, using CN tracks and Mount Royal Tunnel under Mount Royal. The line was cancelled because:

The tracks are now used by the commuter rail Deux-Montagnes Line.

[edit] See also