Line 3 Red (Montreal Metro)
From Wikipedia, the free encyclopedia
In the Montreal Metro, Line 3 was a line that never made it past its planning stage. The line was planned to have 15 stations and end at Cartierville, using CN tracks and Mount Royal Tunnel under Mount Royal. The line was cancelled because:
- Trains would have to use steel wheels.
- The Expo 67 made the Yellow Line more important.
The tracks are now used by the commuter rail Deux-Montagnes Line.
[edit] See also
- Line 7 White (Montreal Metro)
- Line 6 (Montreal Metro)
|
||||||||

