Kintetsu Shima Line

From Wikipedia, the free encyclopedia

Kintetsu Shima Line
Kintetsu Ise-Shima Liner
Info
Type Commuter rail
Locale Mie: Toba, Shima
Terminals Toba
Kashikojima
No. of stations 16
Operation
Opened Jul 23, 1929
Operator(s) Kintetsu
Technical
Line length 24.52 km (15.2 mi)
No. of tracks 1 (18% of line)
2 (82% of line)
Gauge 1,435 mm (4 ft 8½ in)
Electrification Overhead, 1500V DC
Line map

All lines are Kintetsu unless otherwise noted

HSTa
Namba (Osaka)
HST
Uehommachi (Osaka)
LUECKE
LUECKE HSTa
Kyoto
ABZrg HLUECKE STRrf
Right Kashihara LineKyoto Line
HST
Yamato-Yagi
LUECKE
LUECKE HSTa
Nagoya
ABZrg HLUECKE STRrf
Up Osaka LineRight Nagoya Line
HST
Ise-Nakagawa
LUECKE
Up Yamada Line
HST
Ujiyamada
STRlg LUECKE
Up Toba LineLeft JR Sangū Line
CPICle CPICr
0.0 Toba JR: Toba
STR
Down Shima Line
BHF BOOT
1.0 Nakanogō Ise-wan Ferry
TUNNEL1
Akasaki Tunnel
BHF
2.3 Shima-Akasaki
BHF
3.9 Funatsu
SBRÜCKE
National Route 167
BHF
5.5 Kamo
BHF
6.9 Matsuo
BHF
7.9 Shiraki
exSTRrg eABZrf
Left Original track - Closed 1993
exSTRSummit TUNNEL1
Aomine Tunnel
exSTRlf eABZlg
BHF
11.0 Gochi
BHF
12.7 Kutsukake
BHF
14.6 Kaminogō (Old Shima-Isobe)
BHF
16.0 Shima-Isobe (Hasama)
BHF-ELEV
17.6 Anagawa
TUNNEL1
Anagawa Tunnel
BHF
20.4 Shima-Yokoyama
BHF
21.3 Ugata
BUE
National Route 260
BHF
23.1 Shima-Shimmei
WASSER WBRÜCKE WASSER
Ago Bay
xKBFe
24.5 Kashikojima
exKBFe
Shinjukō Closed 1969

The Kintetsu Shima Line (近鉄志摩線 Kintetsu Shima-sen?) is a railway line of the Japanese private railway company Kintetsu, connecting Toba Station (Toba, Mie Prefecture) and Kashikojima Station (Shima, Mie Prefecture) in Japan.

The line connects with the Toba Line at Toba Station. The Yamada Line, Toba Line, and Shima Line form a single train line that begins at Ise-Nakagawa Station and serves the Ise-Shima tourist region.

Contents

[edit] History

In the Meiji era, travelers coming to what is now Shima walked along a long-existing route that is now Mie Route 32, the Ise-Isobe road. As the Meiji era was near its end, in 1911, the government-owned Sangū Line (now owned by JR Central) was extended from the city of Ujiyamada (modern-day Ise) to Toba, therefore any plans for a railroad to Shima would assume Toba, not Ujiyamada, as the origin. As the Taishō era began, many plans were put forth by various members of the railroad industry in the 1910s but none were implemented.

[edit] Shima Electric Railway

In 1923, Shima Electric Railway (志摩電気鉄道 Shima Denki Tetsudō?) was established by Kakuya Morimoto, and by 1924 the plan for a railroad to Shima was finally approved. This plan specified Toba Station as the origin and the gauge of the track would be 1067 mm so that the line could connect directly to the Sangū Line (also 1067 mm) in Toba. The original plan also specified that Ugata Station would be the terminus, however just before construction began, a request was made to members of an already-established railway company, Tōkyū, to see if the plan drawn up by Shima Electric Railway was sound. In the end, the only recommendation made was that the terminus be extended from Ugata to a nearby uninhabited island in Ago Bay called Kashiko Island, citing the island's natural beauty as being an ideal spot to establish a profitable resort and tourism industry to cater to travelers and pilgrims already coming to the area to visit nearby Ise Grand Shrine. Executives at Shima Electric Railway incorporated this suggestion into their plan and decided the line would include two stations on Kashiko Island: Kashikojima Station for tourists, and Shinjukō Station (真珠港駅 Shinjukō-eki lit: Pearl Port Station), the new terminus, for use as a freight station by the area's marine industry. However, the people living near Ugata, the original terminus, opposed the new plan because they felt having the line's endpoint in their area would bring economic benefit. This period of opposition lasted for four years and during that time people living near Ugata refused to sell the land needed by Shima Electric Railway to lay the tracks leading to Kashiko Island, thereby delaying construction. After an agreement was reached, the line was finally completed and opened in 1929, five years after the original plan had been drafted.

In 1944, Shima Electric Railway, along with six other companies, merged to form Mie Transport (Sanco). Twenty years later, the railway department of Sanco split off to become a separate company called Mie Electric Railway (Sanden), however this organization was short-lived as it was bought up by railway giant Kinki Nippon Railway (Kintetsu) the following year, and thus in 1965 the line came under its current name and ownership.

[edit] Kintetsu renovation

In acquiring the line, Kintetsu now had a problem because the Shima Line, which originated at Toba Station, was not connected with the rest of Kintetsu's extensive rail network which only stetched as far as Ujiyamada Station in Ise. Moreover, the railway gauge and voltage used on the Shima Line were different from the majority of Kintetsu lines, including the nearby Yamada Line which terminated at Ujiyamada. For the time being, Kintetsu offered bus service between Ujiyamada and Toba, but in the late 1960s they decided it was worthwhile to create a rail connection between the two in hopes of attracting customers from the upcoming 1970 World's Fair in Osaka by offering direct rail service to the area. This was the impetus for the construction of the Kintetsu Toba Line, and to make direct service possible between the Shima Line, the under-construction Toba Line, the Yamada Line, and beyond, the Shima Line was closed for four months in late 1969 and early 1970 to change the gauge to 1435 mm and double the voltage to 1500V DC to match the other Kintetsu lines it would connect with. Other improvements were added such as the ATS system, a new switching network, and more gradual curves. The renovated Shima Line and the newly-built Toba Line opened together in March of 1970, and Kintetsu began running limited express trains from Namba (Osaka) and Nagoya to Kashikojima just in time for the beginning of the World's Fair. The sharp increase of passengers on the line also motivated Kintetsu to invest money in a variety of tourism business enterprises in the Ise-Shima, especially along the Shima Line.

In 1986, it was decided that a second track on the Shima Line would assist in increasing the speed and number of trains on the line. Construction took several years and now most but not all of the line has dual tracks. The Aomine Tunnel between Shiraki and Gochi was also added to the line during this phase.

[edit] Timeline

  • Jul 23, 1929 - Toba ~ Kashikojima ~ Shinjukō section opened by Shima Electric Railway.
  • Feb 11, 1944 - Shima Electric Railway and six other companies merge to form Mie Transport (Sanco). Line officially renamed Sanco Shima Line.
  • Dec 01, 1946 - Ugataguchi Station officially renamed to Shima-Yokoyama Station.
  • Jul 25, 1949 - Shima-Akasaki Station opens.
  • Feb 01, 1964 - Sanco railway division splits off and forms a new company Mie Electric Railway (Sanden). Line officially renamed Sanden Shima Line.
  • Apr 01, 1965 - Sanden, and all of its lines, are acquired by Kinki Nippon Railway (Kintetsu). Line officially renamed Kintetsu Shima Line.
  • Jul 01, 1969 - Freight service along the line ceases and Shinjukō Station closes. Kashikojima becomes endpoint.
  • Dec 10, 1969 - Shima Line is closed and construction to make various improvements on the line begins.
  • Mar 01, 1970 - Improvements are finished and the Shima Line reopens, now connected to the rest of the Kintetsu rail network. Shima-Isobe Station renamed Kaminogō; Hasama Station renamed Shima-Isobe. Direct service begins from both Osaka and Nagoya to Kashikojima begins.
  • Mar 06, 1988 - Second track opens on Ugata ~ Shima-Shimmei section.
  • Dec 08, 1990 - Second track opens on Shima-Shimmei ~ Kashikojima section.
  • Nov 06, 1992 - Second track opens on Toba ~ Nakanogō section.
  • Dec 22, 1992 - Second track opens on Funatsu ~ Kamo section.
  • Apr 28, 1993 - Second track opens on Gochi ~ Kaminogō section.
  • Jun 01, 1993 - Second track opens on Shima-Isobe ~ Ugata section.
  • Sep 11, 1993 - Second track opens on Kamo ~ Gochi section. Aomine Tunnel completed.
  • Sep 21, 1993 - Tracks re-routed through Aomine Tunnel on Shiraki ~ Gochi section. Total line length reduced by 0.7 km.
  • May 30, 2001 - One man (conductor-less) train service begins.

[edit] Service

 LO  Local (普通 futsū)

Up For Nakagawa
Down For Kashikojima
(Locals stop at every station.)


 LE  Limited Express (特急 tokkyū)

Up For Namba and Uehommachi (Osaka); via Nabari and Yagi (Kashihara)
Up For Kyoto; via Saidaiji (Nara)
Up For Nagoya; via Tsu and Yokkaichi
Down For Kashikojima
(Seat reservations and limited express fee required.)


 NS  Non-stop Limited Express (ノンストップ特急 nonsutoppu tokkyū)

Up For Namba (Osaka)
Up For Nagoya
Down For Kashikojima
(Runs once a day on weekdays, three times a day on weekends.)
(Seat reservations and limited express fee required.)

[edit] Stations

Legend
Trains stop here
| Trains do not stop here
Station Dist (km) Connections LO LE NS Location
Toba 鳥羽 0.0 JR: Sangū Line
Kintetsu: Toba Line
Toba Mie
Prefecture
Nakanogō 中之郷 1.0 Ise-wan Ferry | |
Shima-Akasaki 志摩赤崎 2.3 | |
Funatsu 船津 3.9 | |
Kamo 加茂 5.5 | |
Matsuo 松尾 6.9 | |
Shiraki 白木 7.9 | |
Gochi 五知 11.0 | | Shima
Kutsukake 沓掛 12.7 | |
Kaminogō 上之郷 14.6 | |
Shima-Isobe 志摩磯部 16.0
Anagawa 穴川 17.6 | |
Shima-Yokoyama 志摩横山 20.4 | |
Ugata 鵜方 21.3
Shima-Shimmei 志摩神明 23.1 | |
Kashikojima 賢島 24.5

[edit] References

[edit] External links

view  talk  edit
Kintetsu Lines
1,435 mm lines
Osaka • Nagoya Line Area Osaka LineShigi LineNagoya LineYunoyama LineSuzuka LineYamada LineToba LineShima Line
Nara • Kyoto Line Area Namba LineNara LineIkoma LineKeihanna LineKyoto LineKashihara LineTenri LineTawaramoto Line
1,067 mm lines Minami-Osaka LineDōmyōji LineNagano LineGose LineYoshino Line
762 mm lines Utsube LineHachiōji Line
Funicular lines Ikoma Cable LineNishi-Shigi Cable Line
Ropeway lines Katsuragi Ropeway

Former lines Iga LineHokusei LineYōrō Line
Languages