Interurban Trail (Snohomish County)
From Wikipedia, the free encyclopedia
The Interurban Trail is a rail trail in Snohomish County, Washington. It is a hard-surfaced, non-motorized trail located on the Pacific Northwest Traction right-of-way, a route used until 1939 by the Interurban Trolley between Ballard and Bellingham[1]. The trail in Snohomish County runs over 16 miles (26 km)[2].
The trail is administered in three sections. Snohomish County, Everett, Lynnwood, and Public Utility District No.1 of Snohomish County administer the section from Everett to Lynnwood.[3] From 212th Street SW to 228th Street SW is administered by Mountlake Terrace[4], and the remainder to the King County Line is administered by Edmonds.[5]
Contents |
[edit] Trail Route
From north to south, the trail takes the following route:
- From Pacific Avenue, south on Colby Avenue;
- At 43rd Street, shifting east to hard-surfaced right-of-way south[2].
- Merge with paved roadway to Broadway.[6]
- Broadway south to Highway 526;
- At Highway 526, shifting west, crossing highway, following West Mall Drive south;
- At 112th Street, right-of-way parallels Interstate 5 on west side;
- At 128th Street, crosses Interstate 5 overpass and parallels freeway on east side;
- At 160th Place, heads east, then south on 13th Avenue;
- At 169th Drive, heads west, then parallels Interstate 5 south;
- At Maple Road, crosses Interstate 5, then south crossing Highway 525 to Alderwood Mall Boulevard;
- Parallels Interstate 5 with brief local road detours to 44th Ave;
- Follows right-of-way west to South Lynnwood Neighborhood Park;
- Follows local roads to 212 Street.[7]
- At 212th Street, shifting east to right-of way;
- Right-of-way south to 228th Street.[4]
- At 228th Street, heads west to 76th Avenue;
- Follows 76th Avenue south to county line, joins with Interurban Trail (King County).[4]
[edit] History
In 1910, The Seattle-Everett Interurban Railway began electric passenger service. After the railway was abandoned in 1939, it was converted to a power line corridor. In the 1990s, the right-of-way was opened to pedestrian and bicycle traffic.[8]
Interurban Car 55 is a restored trolley from this route, and is located at Heritage Park, east of Interstate 5 on Poplar Way in Lynnwood next to The Wickers Building, which is now the Transportation Museum. The building was originally located along the rail line and includes an exhibit on its history.[9]
[edit] Future Alignments
In Edmonds, the right-of-way consists of unused dirt alleyways and private property. The City is planning to improve the trail and acquire property, but in the meantime routes trail traffic onto local roadways. Mountlake Terrace's portion of the trail ends at 228th Street SW and Shoreline's part of the trail ends at Highway 104 by 76th Avenue W. Edmonds plans to link these sections.[10]
On the northern portion of the trail, an overpass over Interstate 5 near 128th Street and an extension into downtown Everett is proposed.[3]
[edit] References
- ^ City of Lynnwood: Interurban Trail
- ^ a b The Seattle-Everett Interurban Railway Routes, Then And Now
- ^ a b Snohomish County: Regional Parks: Interurban Trail
- ^ a b c Jones & Stokes. 2007. City of Mountlake Terrace Transportation Master Plan. October. (J&S 00305.07.) Bellevue, WA. Prepared for City of Mountlake Terrace. (Chapter 4: Bicycle Plan)
- ^ City of Shoreline Interurban Trail Map, including Edmonds and part of Mountlake Terrace sections
- ^ NationalMap showing right-of-way
- ^ Snohomish County's Interurban Trail
- ^ Snohomish County History Series: The Seattle-Everett Interurban Railway, 1910-1939
- ^ City of Lynnwood: Heritage Park and the South Snohomish County Visitor Information Center
- ^ HeraldNet: Edmonds to finish Interurban Trail

