This page was created in order to clean up the massive galleries that are located in several articles about buildings in San Francisco. However, instead of deleting a detailed construction picture gallery, the excess construction images will go here with captions. The pictures here were taken from mid-2006 to current.
Pictures here include the midrise and highrise buildings of the complex.
The Millennium Tower in early June 2006.
|
The tower starting to emerge on July 25, 2006.
|
|
Construction site on August 16, there are lots of equipment and items lying around.
|
Construction equipment and pieces lying around.
|
The short crane as of August 16.
|
Concrete core and columns.
|
Worker hosing down site to keep the dust down.
|
Wooden forms forming a rectangular box, it's probably the entrance to the parking garage located under the shorter tower.
|
The crane and worksite overall.
|
|
The crane looming over the worksite and construction items.
|
|
|
The site, crane, concrete core, rebar, etc.
|
|
|
Another crane for the excavation of the underground parking garage and midrise, 300 Spear is in the back.
|
|
|
|
Work on the excavation and second crane.
|
Neighboring buildings and the tower on 1-14-07.
|
|
Close up of concrete on 1-27-07.
|
The tower and cladding in March.
|
The red crane and hole in March.
|
The tower finally emerging out of the surrounding skyline in May.
|
|
|
|
The new crane that was set up in July.
|
The Millennium Tower in mid-August.
|
The advertising sheets and blue curtainwall glass in mid-August.
|
|
|
|
Reflection of the shorter crane and 201 Mission Street in mid-August.
|
The 301 Mission Pit in mid-August.
|
Progress on the midrise with One Rincon Hill in the back.
|
View of the tower from the southwest.
|
The Millennium Tower in September.
|
The Millennium Tower in late-September.
|
Glass reflection of the tower.
|
The Millennium Tower in late-October.
|
|
|
|
|
The Millennium Tower in November.
|
Progress on the 301 Mission Street midrise.
|
The tower and curtainwall glass progress.
|
The Millennium Tower as viewed from Mission Street.
|
|
The tower from the southeast.
|
The structure in December.
|
|
|
|
|
View of the curtainwall glass.
|
|
|
|
|
|
Pictures here include the South Tower and the townhouses of the complex.
|
|
Closer view of the rebar for the South Tower.
|
|
Closer view of the site. the lifting rig for the crane can be seen as well as the scaffolding around the site.
|
|
|
|
Columns for the townhouses can be seen.
|
Closer view of massive foundation.
|
The crane from the south.
|
|
|
Advertisement and the rebar columns.
|
|
|
|
|
|
|
|
Concrete is being placed at this time.
|
Meeting/event floor/lobby and the first floors of condos.
|
Townhouses will poke out of the hole eventually.
|
View from the intersection.
|
|
The crane and the concrete structure alone.
|
The massive foundation under the concrete structure.
|
|
|
|
|
|
|
|
Massive foundation, rebar columns for the townhouses and the lower levels of the tower.
|
Yellow crane (used for Rincon Hill) and black crane (used for Western Approach Replacement Project).
|
Crane and building so far.
|
Closer view of the columns for the townhouses.
|
|
|
Another picture of the elevator lift.
|
View from Interstate 80 heading east on October 29
|
|
|
Note how the structure hides the Bay Bridge.
|
|
|
|
|
|
Southwestern face curtainwall glass.
|
One Rincon Hill in mid-December, taken on westbound Interstate 80.
|
|
Closer view of the glass.
|
|
|
The two cranes; by this time, the podium is clearly visible above street level.
|
|
|
One Rincon Hill in mid-February.
|
|
|
The tower and crane in March.
|
The tower as seen from a few blocks away.
|
|
From Interstate 80 east in May.
|
Up close from eastbound 80.
|
|
|
The tower as viewed from the south.
|
Close up of work on the upper reaches of the tower.
|
The tower up close from Westbound 80 in mid June.
|
A close shot of the tower in mid-July.
|
Work on the townhouses as traffic destined for the Bay Bridge passes by.
|
Another shot of the tower.
|
One Rincon Hill from afar.
|
One Rincon Hill from another angle.
|
Work on the upper floors of the tower in mid-August.
|
The tower compared to the rest of the Rincon Hill district.
|
The South Tower in September.
|
The crane and South Tower.
|
The South Tower in late-September.
|
The south face of One Rincon Hill.
|
The north face of the South Tower in October.
|
Work on the aluminum crown.
|
The tower from westbound Interstate 80 in October.
|
The tower during sunset in November, with the crane long gone.
|
The tower and townhomes in December.
|
View of the main entrance.
|
|
|
Sign on construction site.
|
Excavation underway in October 2006.
|
|
|
Drive by picture of the still empty site in late May.
|
A shot of the steel beam which will from the lobby.
|
The crane and steel beams.
|
Steel structure in mid-July.
|
The steel structure in mid-August.
|
The crane and steel structure in mid-August.
|
View from across Mission Street.
|
Rapid progress on 555 Mission Street, seen here in September.
|
The steel structure in late-September.
|
555 Mission in late October.
|
View of the steel structure with curtainwall glass installed.
|
The structure in November.
|
|
|
The steel structure and fireproofing work.
|
The crane footing and curtainglass installation.
|
|
The southeast face of the tower.
|
The view in December from across Mission Street.
|
|
Close up of the curtainwall glass.
|
View of the steel structure and fireproofing progress.
|
|
Progress on the curtainwall glass.
|
|
|
|
|
|
555 Mission Street in February.
|
|
|
Pictures here include all four buildings in the complex or the two midrises and two highrises.
|
|
The concrete core of the Infinity II (Main St. highrise) and the tower crane. By the time the picture was taken, the top of the concrete elevator core was very close to the crane, making a lift of the tower crane necessary for construction to continue. Taken on July 16, 2006.
|
The Main St. Midrise tower and the foot of the smaller tower crane. Part of the large advertisement for the condo complex can be seen on the building to the southeast of The Infinity.
|
A week (July 23) after the first picture of the tower crane was taken (on July 16), the tower crane has been raised a few stories and towers over the construction site for now.
|
Men working on the lifting rig of the tower crane.
|
|
View of the site from the corner of Main St. and Harrison St.
|
|
The two tower cranes on July 25, 2006. Most of the giant advertisement for the towers can be seen behind the smaller crane.
|
View of the site. The first blue tiles of the future shotcrete wall have been placed. They cover two vertical pipes.
|
Work on the Spear St. towers should begin soon and a third tower crane erected.
|
The raised crane and concrete core on August 6.
|
First piece of curtainwall glass.
|
The big pit, soon it will disappear.
|
|
|
Concrete core of The Infinity II and safety netting being set up.
|
More glass on the building and a concrete truck.
|
View from Main and Folsom St.
|
The Infinity II and the midrise.
|
|
|
|
|
|
|
|
More glass placed and safety netting being set up on August 17.
|
First piece of the third tower crane.
|
Concrete core and crane on August 17.
|
|
|
|
|
|
|
|
Power lines and the tower.
|
First part of the grey concrete wall sticking out of the side of the tower and elevator lift.
|
The blue tiles, they once covered only two vertical pipes a month ago, now they cover a significant portion of the concrete structure. They are part of the future shotcrete wall.
|
The blue tiles on the Infinity II, this is where the building will be blocked by the Spear St. midrise that is going to go up soon.
|
The cab of the mobile crane.
|
Spear St. midrise (left) and highrise (right) and the crane.
|
Blue wall and mobile crane.
|
|
|
Different view of cranes.
|
The pit where two more buildings will rise.
|
Peek-a-boo view of the Infinity II from around One Rincon Hill.
|
|
|
|
|
Sunset view of the tower crane and the Infinity II on September 17. The curtainwall glass is reflecting the sky.
|
Midrise crane, the midrise, and the Bay Bridge. The once eminent advertisement is almost hidden behind the midrise that continues to rise.
|
Glowing crane and the dark concrete structure.
|
The third tower crane erect back in early September.
|
The three cranes of the site.
|
Lower view. The shotcrete wall has made substantial progress and it is no longer blue.
|
Zenith view of the third crane boom.
|
Building on October 7. The crane is being raised.
|
|
Glass curtainwall progress.
|
The tower crane pieces that will be put in as the crane is raised.
|
The red counterweight hung by the crane as the lifting rig raises the crane.
|
Surveyor monitoring the lift.
|
|
|
Progress on the Infinity II.
|
Midrise, crane pieces and the Infinity II.
|
|
|
|
|
|
|
Midrise and the Infinity II.
|
|
|
|
The Infinity II in late October 28.
|
The crane on top of The Infinity II.
|
|
|
The Main Street midrise (by late Fall the small crane was gone).
|
Another picture of wooden form and pit.
|
View from Bay Bridge (Eastbound).
|
View from Bay Bridge on November 5.
|
The Spear Street midrise in December.
|
|
The Infinity II in December.
|
The Infinity II and cladding in January.
|
Foot of shorter tower crane and both the larger tower crane and 300 Spear II in the back.
|
|
300 Spear II (with crane), the Main St. midrise (lower middle) and the concrete core of 300 Spear I on the lower left on 1-27-07.
|
300 Spear complex as viewed from the Millennium Tower in March.
|
|
|
|
The Main Street midrise in March.
|
The Infinity II and the Spear Street midrise in late-May.
|
The Infinity I in mid-July.
|
Progress on the southern end of the Infinity complex.
|
The site in mid-July (The Infinity II and the Main Street midrise.
|
The Spear street midrise in mid-July.
|
The Infinity II tower in mid-August, with ropes hanging down.
|
The Spear Street midrise.
|
The Infinity I in mid-August.
|
The plaza in between the buildings.
|
|
|
The Infinity II in mid-August, with exterior cladding work complete. The crane for The Infinity I can be seen on the left.
|
The Infinity I in September, with nine floors.
|
The crane and the buildings on Spear Street.
|
Crane on the Infinity I getting jumped.
|
|The Infinity II in late-September.
|
The Spear Street midrise in October.
|
The Infinity II and the Main Street midrise in October.
|
The topped-out Infinity II and the under construction Infinity I in the back.
|
The Infinity I in late-October.
|
|
The concrete structure of the Infinity I, with no curtainwall glass attached.
|
|
|
|
The complex in December.
|
Work on the second tower.
|
The Infinity I in December.
|
|
|
The completed first tower and progress on the second tower in early-February 2008.
|
|
|
Work on the second tower in late-February.
|
View of the midrise and the two towers.
|