Herefordshire and Gloucestershire Canal

From Wikipedia, the free encyclopedia

Herefordshire and Gloucestershire Canal
ugHSTa
Barrs Court Basin, Hereford
uLABZrg uLBASINr
New Basin
ugKRZuy
College Road
uLABZlf uLSTRlg
new route round factory
ugKRZu uKRZu
Railway bridges
uLABZrg uLSTRrf
uTUNNEL1
Aylestone Tunnel
ueSTR
Aylestone Park project
ugAROADu
A4105 Roman Road bridge
ugKRZu
Hereford - Worcester Rly
uxgUKRZo
River Lugg aqueduct
ugAROADu
A465 road bridge
uexLOCKSd
Yarkhill locks (3)
uxAROADu
A4103 Roman Road bridge
ugKRZuy
Skew Bridge, Monkhide
ugFGATEd
Monkhide Lock
uxgUKRZo
River Frome aqueduct
uxAROADu
A417 road bridge
uxFEEDERr
feeder from River Frome
uTUNNEL1
Ashperton Tunnel (400 yd)
uxgUKRZo
River Leadon aqueduct
ugSTR + STRlg
Railway to Ledbury Station
ugLOCKSu
Bye St Locks, Ledbury (5)
ugFGATEu
Hazle Lock
ugFGATEu
Leather Lock
ugSTR
ugSTR DST legende
Dymock
ugSTR + STRrf
Railway avoided tunnel
uxAKRZu2
M50 Motorway
uTUNNEL1
Oxenhall Tunnel (2192 yd)
uxKRZuy
Coldharbour Lane bridge
ugSTRrg
ugJUNCrd + ueSTR
Start of Coal Branch
ugSTR uexFGATEu
Top lock
ugKRZuy uxKRZuy
Three Ashes Lane bridges
ugSTR uexFGATEu
House Lock, Oxenhall
ugFGATEd ugSTR
Coal Branch lock
ugWHARF ugSTR
Coal Branch wharf
ugFGATEu
Bottom (No 2) Lock
ugSTR + STRlg
Railway avoided tunnel
ugFGATEu
Devin's Lock
uxgUKRZo
Ell Brook Aqueduct
ugSTR DST legende
Newent
ugFGATEu
Newend Lock
ugFGATEu
Philip's Lock
ugFGATEu
Road lock
ugFGATEu
Coneybury Lock
ugLOCKSu
Double Locks
ugFGATEu
Rudford lock
ugSTR + STRrf
Railway to Gloucester
uHST
Over basin
uFGATEu
Over lock
uJUNCe
River Severn
DST legende
Gloucester

The Herefordshire and Gloucestershire Canal (sometimes known as the Hereford and Gloucester Canal) is a canal in the west of England, which ran from Hereford, the county town of Herefordshire to Gloucester the county town of Gloucestershire, where it linked to the River Severn. It was opened in two phases in 1798 and 1845, and closed in 1881, when the southern section was used for the course of the Gloucester to Ledbury Railway. It is currently the subject of an active restoration scheme.

Contents

[edit] History

The first plans for a canal between Hereford and Gloucester were made by Robert Whitworth, one of James Brindley's pupils, in 1777. The route was part of a grander plan to link Stourport on Severn and Leominster as well. Twelve years later, Richard Hall submitted plans for a canal via Ledbury. The route was revised to pass to the west of Ledbury, rather than to the east, and with Josiah Clowes as engineer, parliamentary approval was sought. An Act of Parliament was obtained in April 1791. Hugh Henshall, who was the brother-in-law of James Brindley, was asked to re-survey the route in 1792, and recommended a diversion to Newent, where there were minor coalfields. This route required a tunnel at Oxenhall, and another act of parliament was obtained in 1793 to sanction the new route. By 1795, the initial section was open to Newent, but the tunnel was causing major problems.[1]

In order to build the canal, twenty shafts were sunk along its route, so that there could be multiple working faces. However, there were considerable difficulties caused by the volume of water entering the shafts. Horse-powered pumps proved inadequate, and eventually steam-powered pumps were employed,[2] but this added to the cost, and the tunnel was a large factor in the failure to complete the canal.

The canal was opened to within one mile of Ledbury in 1798, but stopped there as the cost had far exceeded the estimates. Ledbury remained the terminus for another forty years, although a short extension to enable coal to be delivered to the Ledbury gas works was completed in 1832.[1] The Coal Branch to the mines at Newent was never a success, as the coal was of very poor quality, and the branch fell into disuse very quickly.[2]

[edit] Second Phase

In 1827, Stephen Ballard became the new clerk of the company, and produced a report on how to complete the canal in 1829. In 1838, he proposed a new route for the final section, but the engineer James Walker advised against it, and so in May 1839, a new Act of Parliament was obtained, allowing the company to raise the money to complete the canal. Work started on 17 November. A feeder from the River Frome to the summit level was completed in August 1842, and the canal opened in stages as it was completed, with extensions to Canon Frome wharf in January 1843, Whithington wharf in February 1844, and finally to Hereford basin on 22 May 1845.[1]

As with the first phase, it was the tunnel construction which caused the most problems, and Ashperton tunnel, although only 400 yards (366m) long, was affected by water flooding the work faces and by unstable rock, resulting in the need to construct a brick and stone lining. Again, costs escalated well beyond the original estimates.[3]

[edit] Operation

The canal had cost far more to build than was originally planned. The whole canal had been estimated at £69,997 by Josiah Clowes in 1790, but the section to Ledbury had cost in excess of £104,000. Stephen Ballard had estimated the cost of the second phase at £53,000, but the final cost had been £141,436. With little increase in trade from the longer canal, the company tried to sell it to a railway company almost immediately, but were unsuccessful, and so tried to boost trade.[1]

Traffic started to increase, to the extent that a timetable for the transit of the Oxenhall tunnel had to be introduced in 1849. This was not always successful, as the Hereford Times carried articles in May 1851 about an incident in which boats travelling in opposite directions had met in the middle, and neither would give way. There was deadlock for a period of 58 hours.[4]

[edit] Decline and Closure

In 1858, the canal carried 47,560 tons of goods, and generated an income of £7,061 in 1860, but some of this was derived from the carriage of materials to build railways in the area. On 17 January 1862, less than 17 years after the opening to Hereford, the canal was leased to the Great Western and West Midland Railways, with a view to converting it to a railway. This did not take place immediately, but on 30 June 1881, half of the canal was closed,[1], and sections of it were used for the course of the Ledbury to Gloucester railway.[2] The Hereford to Ledbury section remained open, but gradually became disused.[3] The Canal Company continued to receive rent from the Great Western Railway, and was not formally wound up until the railways were nationalised in 1948.[1]

[edit] Route

The canal ran for 34 miles (54km) from Hereford basin through Ledbury, Dymock and Newent to Over, on the River Severn at Gloucester, with a short branch at Newent to the coal fields. The first six miles (9.6km) from Hereford to Withington, which includes the Aylestone tunnel, was level, after which the canal rose by 30 ft (9.2m) through four locks over the three miles to Monkhide. This section includes the skew bridge at Monkhide, built by Ballard at an angle of 60 degrees to the canal.[5] There is then another level section of more than eight miles to the outskirts of Ledbury, which includes the Ashperton tunnel. Water is fed into this section from the River Frome. The final 18 miles (29km) to Over falls by 195 ft (59.5m), and includes the 2192 yd (2006m) Oxenhall tunnel,[6] which was not destroyed by the construction of the railway, as the railway company took the sensible decision to avoid the likely problems of enlarging it, and built a diversion to the south-west. The coal branch left the canal below the tunnel, and dropped 10 ft (3m) through one lock. The canal had 23 locks, 22 on the main line and one on the branch, and 3 tunnels. Like many English canals it was built to carry valuable cargoes by narrowboats.

[edit] Restoration

The canal is now undergoing restoration by the Herefordshire and Gloucestershire Canal Trust (H&G Canal Trust). Since 1983 the Trust has pursued its aim to fully restore the 34 miles (54 km) of canal and locks which will once again link Hereford with Ledbury, Dymock, Newent and the rest of the inland waterway system at Gloucester.

Since 1991 the local council authorities in Herefordshire have set aside land for development as a canal route. The planning department has approved projects with the canal in mind, and has taken action against those trying to build on the proposed route of the canal. Similar support has been given by the local council authorities in Gloucestershire. In 2000, the Over Canal Basin (adjacent to the River Severn on the outskirts of Gloucester, where the Canal links with the inland waterways network) was reconstructed entirely by volunteers from the Canal Trust and the national volunteer body the Waterway Recovery Group.[7] Some £500,000 of work was undertaken, against a 10 month deadline, with a budget of just £60,000.

Major re-development in Hereford town centre has resulted in the construction of a new canal bed which will eventually link to a new basin, to form the centrepiece of the Edgar Street Grid development.[8][9] Further development of the Aylestone Park section is also taking place, following the removal of silt containing heavy metals.[10]

[edit] Visitor Centre

The Wharf House (01452 332 900) is the Herefordshire & Gloucestershire Canal Trust's new visitor centre, tea rooms by day and restaurant by night, situated at Over (close to the A417/A40 roundabout 1 mile (1.6 km) west of Gloucester) - all profits are donated to the H&G Canal Trust Charity.

[edit] References

[edit] See also

[edit] External links