F-4 Terminator 2020
From Wikipedia, the free encyclopedia
| It has been suggested that this article or section be merged with F-4 Phantom II. (Discuss) |
| This article does not cite any references or sources. (May 2008) Please help improve this article by adding citations to reliable sources. Unverifiable material may be challenged and removed. |
| This article lacks information on the notability of the subject matter. Please help improve this article by providing context for a general audience, especially in the lead section. (May 2008) |
| This article may require cleanup to meet Wikipedia's quality standards. Please improve this article if you can. (May 2008) |
| This article or section needs to be wikified to meet Wikipedia's quality standards. Please help improve this article with relevant internal links. (May 2008) |
The F-4 Terminator 2020 is a heavily modified and modernized F-4E Phantom II used by the Turkish Air Force[1]. It is also sometimes dubbed the poor man's F-15. Buying a more sophisticated supersonic fighter, like the F-15 Eagle or Panavia Tornado, was too expensive thus, the THK decided to upgrade its Phantom fleet with improvements to avionics and structure, but not to the engines. In August 1995, after a hotly contested competition with DASA (F-4 ICE), Israeli Aircraft Industries was awarded a USD600M contract to upgrade 54 F-4Es to Phantom 2020 standard. The first 26 aircraft were rebuilt in Israel, and the other 28 in Turkey.
[edit] Structure
Small strakes above the air intakes to improve agility, new attachment fittings, engine mountings, stronger wing fold ribs, updated canopy sill bar, 20 km of wiring replaced (reducing weight by 750 kg) as well as most hydraulic and pneumatic lines and hoses, and fuel tank reinforcements.
[edit] Avionics
New MFD (multifunction display) in the front cockpit plus two in the rear, new Kaiser El-OP 976 wide-angle HUD and HOTAS system, high performance Elta ELO/M-2032 ISAR-capable high-resolution SAR/GMTI (ground moving target indicator) multi-mode fire control radar (developed for the IAI Lavi), IAIC mission computer, new navigation equipment including GPS/INS connected to mapping mode, dual MIL-STD-553B databus managing avionics package, Astronautics Central Air Data Computer, new UHF and IFF packages, airborne video tape recorder (AVTR), Elta EL/L-8222 active ECM pod and Mikes (Aselsan) AN/ALQ-178V3 passive embedded SPEWS, and RWR.
Additionally they had AGM-142 Popeye/Have Nap integration, Litening-II targeting pods, and the capability to launch AGM-65D/G Maverick, AGM-88 HARM, GBU-8 HOBOS, GBU-10/12 Paveway II LGBs, general purpose and cluster bombs for air-to-ground missions, while retaining the capability to launch AIM-7 Sparrow and AIM-9 Sidewinder air-to-air missiles. It is also possible to install Pave Spike targeting pods and rocket pods of all sizes.
These upgraded F-4 Phantoms are referred to as the F-4E-2020 Terminator. They will be in service until at least 2015 and perhaps longer. The first entered service on 27 January 2000 with deliveries to 111 and 171 Filo.
|
||||||||||||||

