Engineering laboratory (Marshall University)
From Wikipedia, the free encyclopedia
| This article or section contains information about expected future buildings or structures. Some or all of this information may be speculative, and the content may change as building construction begins. |
The Engineering Laboratory at Marshall University will be located near the corner of 3rd Avenue and Hal Greer Blvd. in Huntington, West Virginia [1].
Contents |
[edit] History
On April 20, 2007, the Engineering Laboratory design was unveiled at Marshall University's Alumni Weekend [1]. Construction on the $3.5 million facility is expected to begin in August and be completed by fall 2008. It is part of Phase I of the future Engineering Complex.
It will consist of 16,000 sq. ft. and feature,
- a control lab,
- an envrionmental lab,
- a structures lab,
- a materials lab,
- a soils lab,
- a machine shop,
- a balance Room,
- and a visualization center.
The Engineering Laboratory is Phase I of the future Engineering Complex that will be constructed north of 3rd Avenue. Another larger structure is planned east of the Laboratory.


