Image:Dragon in build Feb 08.jpg

From Wikipedia, the free encyclopedia

[edit] Licensing

[edit] Details

The forward section of Dragon on the BAE Systems slipway at Govan, Glasgow at approximately 17:20 on 20 February 2008. The stern section is in the open about 300 meters to the right of the photo, and the centre section is inside the construction hall whose roof can be seen behind the forward section. The foremast is also in the open, about 300 yards to the left of the picture. The white tarpaulins cover the join between the bridge section and the bow.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current17:49, 20 February 20081,226×753 (48 KB)Shem1805 (Talk | contribs)

The following files are duplicates of this file:

The following pages on the English Wikipedia link to this file (pages on other projects are not listed):