CityRail Clearways Project
From Wikipedia, the free encyclopedia
| This article or section contains information about a planned or expected public transportation infrastructure in Australia. It may contain information of a speculative nature and the content may change dramatically as the construction and/or completion of the infrastructure approaches, and more information becomes available. |
The CityRail Clearways Project is a $1.8 billion dollar program of public works on Sydney's CityRail suburban railway network to "untangle" the excessively intertwined and complicated rail network. The NSW Government has suffered heavy criticism for its perceived mishandling of the Sydney rail network - which had very poor on time performance following the Waterfall train disaster in January 2003. The safety regime introduced after this crash required drivers to stick to the speed limit, which often caused delays due to the expectations of the timetable for higher speeds. A new slower timetable was introduced in September 2005, which significantly improved on time running.[1] The clearways plan is intended to be the next step in improving on time performance.
Currently, delays on one part of the system can affect trains in a completely different section of the network, due to the heavily interwoven system in which infrastructure, carriages and services are shared between lines. The Clearways project aims to divide the network's fourteen metropolitan rail lines into five independent "clearways". This is intended to isolate incidents to one part of the network so other clearways will still run as scheduled, increasing on time performance. The clearways will feed the existing lines through the Central Business District.[2] As the Carlingford Line does not run through the CBD, it is not included in any of the clearway routes. However, a Carlingford Line upgrade is still included in the clearways project. The Cumberland Line is spread across Clearways 4 and 5. Intercity lines are not included in the project but may incur fewer delays as trains pass through the suburban area and benefit from the improved reliability of suburban services.[3]
Contents |
[edit] Clearways routes
The five clearways routes proposed are designed to improve capacity and help isolate operating problems. These routes are:
[edit] Clearway 1: Eastern Suburbs and Illawarra
This route will not change from the current Eastern Suburbs and Illawarra line. The projects being undertaken on this route will increase capacity.
[edit] Clearway 2: Bankstown
After the Airport line was opened in 2000, most East Hills line trains used the new line to approach the city, easing congestion on the line between Sydenham and Erskineville, where tracks are shared with the Bankstown line. As of 2006 almost all East Hills trains run via the Airport. After the Campbelltown express clearway opens, trains from the south west will again run via Sydenham. This requires dedicated tracks for the Bankstown line between Sydenham and Erskineville. St Peters and Erskineville railway stations are expected to continue to be served by the Bankstown line and will require new platforms. A new turnback platform will also be constructed at Lidcombe, separating the Bankstown line's operations from the Inner West line which will be truncated to Homebush.
[edit] Clearway 3: Campbelltown Express
The Campbelltown Express Clearway will separate the section of the East Hills line west of Revesby from the inner section that line by quaduplicating between Kingsgrove and Revesby. This will allow more frequent express services to the City, relieve pressure on other parts of the network and improve the distribution of passengers. Trains will go from Macarthur through to Revesby then express through to the City Circle via Sydenham and back again.
[edit] Clearway 4: Airport and South
The Airport and South Clearway will feed the Inner West, East Hills and Airport, and South lines. Faster services from the South Line will begin at Glenfield and make their way through Liverpool, Cabramatta, Granville, Lidcombe and Strathfield stations to the City Circle. All-stations Inner West Line services to the City will start at Homebush.[4] After passing through the City Circle, trains will head south-west via the Airport to Revesby (running parallel with the Campbelltown Express line from Wolli Creek to Revesby).
[edit] Clearway 5: North West
North West Clearway will provide an independent corridor for the North Shore, Northern and Western lines, as well as the currently under construction Epping to Chatswood line. It will improve reliability and capacity. Trains from the west will start from the Richmond, Penrith or Epping branches, meet up at Strathfield and travel through the city to Chatswood. Here trains will split, either continuing up the North Shore line to Berowra, or via the Epping to Chatswood line to Hornsby.
[edit] Projects
Many infrastructure upgrades need to be completed in order to implement the Clearways plan. These projects include upgrading stations, adding extra tracks, stabling facilities, or upgrading junctions. The projects include:
| Project | Clearway[4] | Completed |
|---|---|---|
| Berowra third platform | North West | October 2006 |
| Bondi Junction turnback scissors crossover and stabling sidings |
Eastern Suburbs and Illawarra | July 2006 |
| Clyde-Carlingford passing loop on single line | N/A | |
| Erskineville-Sydenham six tracks | Bankstown, Campbelltown Express | |
| Homebush Turnback | Airport and South | (under construction) |
| Hornsby Platform 5 | North West | (under construction) |
| Kingsgrove-Revesby quadruplication | Campbelltown Express | |
| Lidcombe Turnback | Bankstown | (under construction) |
| Liverpool Turnback | Bankstown | |
| Macarthur Platform 4 | Campbelltown Express | |
| Macdonaldtown Turnback | Airport and South | 2006 |
| Macdonaldtown Stabling | Airport and South | November 2007 |
| Quakers Hill-Schofields duplication | North West | |
| Revesby turnback | Airport and South | (under construction) |
| Sutherland-Cronulla duplication | Eastern Suburbs and Illawarra | (under construction) |
[edit] Resignalling
- Sefton - completed Jan 2006.
- Oatley-Sutherland-Cronulla
[edit] Easy Access
[edit] Other
Other projects not officially part of the clearways project but will also improve the network include:
- Epping to Chatswood Line, Sydney.
- Southern Sydney Freight Line by ARTC.
- North Strathfield to Hornsby freight facilities by ARTC including refuge loops and quadruplication.
- Port Botany duplication stage 4.
- North Warnervale — new station
- Glendale — new station
- Flinders — new station
[edit] See also
Western FastRail
Chicago Region Environmental and Transportation Efficiency Program (CREATE)
Sandgate Flyover
[edit] References
[edit] External links
- CityRail Rail Clearways Plan Official info on the Clearways Project