CF-18 Hornet
From Wikipedia, the free encyclopedia
| CF-18 Hornet | |
|---|---|
|
A Canadian CF-18 flies off the coast of Hawaii |
|
| Type | Multirole fighter |
| Manufacturer | McDonnell Douglas / Boeing |
| Maiden flight | 1978-11-18 |
| Introduced | 1983-01-07 |
| Primary user | Canadian Forces |
| Unit cost | US$35 million in 2003[citation needed] |
| Developed from | F/A-18 Hornet |
The McDonnell Douglas CF-18 Hornet (CF-188) is a Canadian Forces aircraft, based on the American F/A-18 Hornet.
Contents |
[edit] Development
[edit] The New Fighter Aircraft Competition
In 1977, the Canadian government identified the need to replace the NATO assigned CF-104 Starfighter, the NORAD assigned CF-101 Voodoo and the CF-116 Freedom Fighter, although the decision was made to keep the CF-116. The subsequent decision was to proceed with the New Fighter Aircraft competition, with a purchase budget of around 2.4 billion CAD to purchase 130-150 of the winner of the competition. Candidates included the F-14 Tomcat, F-15 Eagle, Panavia Tornado, Dassault Mirage F1 (later substituted by the Mirage 2000), plus the products of the American Lightweight Fighter (LWF) competition, the F-16 Falcon and F/A-18 Hornet. The government stressed that the winner of the competition be a proven off-the-shelf design and provide substantial industrial benefits as part of the order.
By 1978, the New Fighter Aircraft competitors were short listed to just two aircraft; the F-16 Falcon and F/A-18 Hornet. The F-14, F-15, and the Tornado were rejected due to the high purchase price, while Dassault dropped out of the competition. However, the F-14 almost entered Canadian service through the backdoor due to the Iranian Revolution. Canada tried hard to convince the Iranians to sell its almost-new F-14 fighters at cut-rate prices due to the US cutting off the supply of spare parts to Iran. However, the negotiations died before a deal was reached as it was revealed that Canadian involvement was instrumental for the smuggling of American embassy personnel out of the new Islamic Republic.[1]
In 1980, the McDonnell Douglas F/A-18 Hornet was declared the winner of the New Fighter Aircraft competition. The order included 98 single-seat variants and 40 dual-seat variants, for a total of 138 purchased, plus 20 options (which were not exercised). The F/A-18 Hornet was then dubbed the CF-188 (the name Hornet not being used as the translation in French is "Frelon," which is already used by a French military helicopter). However, in every context except the most official of military documents, the planes are referred to as CF-18 Hornets. Reasons for the selection listed by the Canadian Forces were many of the features that was requested to be included for the US Navy; two engines for reliability (considered essential for conducting Arctic sovereignty and over the water patrols), an excellent radar set, while being considerably more affordable than the F-14 and the F-15.
[edit] CF-18 design changes
The most visible difference between a CF-18 and a US F-18 is the 600,000 candela night identification light. This spotlight is mounted in the gun loading door on the port side of the aircraft. Some CF-18s have the light temporarily removed, but the window is always in place. Also, the underside of the CF-18 features a painted "dummy canopy". This is intended to disorient and confuse an enemy in air-to-air combat.
Many features that made the F/A-18 suitable for naval carrier operations were also retained by the Canadian Forces, such as the robust landing gear, the arrestor hook, and wing-folding mechanisms, which proved useful when operating the fighters from smaller airfields such as those found in the Arctic.
[edit] Operational history
[edit] Introduction into Canadian Service
The first two CF-18 were formally handed over to 410 (Operational Training Unit) Squadron at CFB Cold Lake, Alberta on October 25, 1982.[2] Further deliveries equipped 409, 439, and 421 Squadrons at Baden-Soellingen in then West Germany, the 410 Operation Training Unit, 416, and 441 Squadrons at Cold Lake, and 425 and 433 Squadrons at Bagotville, Quebec. However, introduction into Canadian service was initially problematic due to early issues with structural fatigue which delayed initial deployment. As the initial bugs were worked out, the CF-18 started filling the NORAD interception and NATO roles as intended.
[edit] Combat
In 1991, Canada committed 26 CF-18s to the Gulf War (aka Desert Shield/Desert Storm), these were based in Doha, Qatar. During the Gulf War, Canadian pilots flew 5,700+ hours, including 2,700 combat air patrol missions. These aircraft were taken from Canada's airbase in Germany, CFB Baden-Soellingen (now a civilian airport). In the beginning the CF-18s began sweep and escort combat missions to support ground-attack strikes by Allied air forces. However, during the 100-hour Allied ground invasion in late February, CF-18s also flew 56 bombing sorties, mainly dropping 500 lb (230 kg) conventional ("dumb") bombs on Iraqi artillery positions, supply dumps, and marshaling areas behind the lines. At the time the Canadian Hornets were unable to deploy precision guided munitions (PGMs).
Continuing violence in the former Yugoslavia brought CF-18s into theatre twice: first for a three-month deployment (Op Mirador, August–November 1997) for air patrols supporting NATO peacekeepers in Bosnia-Herzegovina, and again from late June 1998 until late December 2000 (Op Echo).
In June 1999, with 18 CF-18s already deployed to Aviano, Italy, Canada participated in both the air-to-ground and air-to-air roles. Canadian aircraft conducted ten percent of the NATO strike sorties despite deploying a much smaller percentage of the overall forces. Canadian pilots flew 678 combat sorties—120 defensive counter-air escorts for Allied strike packages and 558 bombing strikes—during 2,577 combat-flying hours. CF-18s dropped a total of 397 PGMs and 171 free-fall iron bombs on a wide variety of targets including surface-to-air missile sites, airfields, bridges and fuel storage areas.
[edit] The Future of the Fleet
In 2000, the need to upgrade the CF-18 became necessary as demonstrated during Operation Desert Storm and during the 1998 Kosovo conflict as advances in technology had rendered some of the avionics on board the CF-18 obsolete and out of step when operating with NATO allies. As a response, the military initiated in 2001 a major modernization programme for the CF-18 dubbed the CF-18 Incremental Modernization Project (IMP). The project was broken into two phases over a period of 7 years and is meant to improve air-to-air and air-to-ground combat capabilities, upgrade sensors and the defensive suite, and replace the datalinks and communications systems on board the CF-18 from the old F/A-18A and F/A-18B standard to the current F/A-18C and D standard. The project is supposed to extend the life of the CF-18 until 2017-2020, at which point, the F-35 Lightning II (JSF) is expected to replace the CF-18. Boeing (merged with McDonnell Douglas) the primary contractor and L-3 Communications the primary subcontractor, was then issued a contract for the modernization project starting in 2002. 80 CF-18's, consisting of 62 single-seat and 18 dual-seat models were selected from the fleet for the upgrade progamme.
Phase I of the CF-18 Incremental Modernization Project consisted of:
- Replacing the old Hughes AN/APG-65 radar with the new Hughes (now Raytheon) AN/APG-73 radar, which had triple the processing speed and memory capacity of the old AN/APG-65 radar, while also incorporating Terrain Following and Terrain Avoidance modes for low level ground attack missions. Furthermore, the new AN/APG-73 radar was also capable of guiding the modern AIM-120 AMRAAM medium range missiles that were to be purchased.
- Addition of the BAE Systems AN/APX-111 Combined interrogator and transponder, otherwise known as an IFF (Identification Friend or Foe). The new IFF brings the CF-18 up to current NATO standards for combat identification and will allow the AIM-120 AMRAAM missiles to be used out to their maximum range while reducing the risk of ‘friendly-fire’ incidents.
- Replacement of the old radios with the new Rockwell Collins AN/ARC-210 RT-1556/ARC VHF/UHF Radio. This radio, capable of line-of-sight communications on VHF/UHF frequencies as well as HAVE QUICK, HAVE QUICK II, and SINCGARS waveforms resolved the issues of compatibility with allied forces that became apparent during the 1991 Gulf War and the Kosovo Conflict, and are furthermore, more resistant to jamming while providing enhanced data link capabilities that previously required the need of multiple radios to accomplish.
- Replacement of the old mission computer with the General Dynamics Advanced Information Systems AN/AYK-14 XN-8 mission computer, which offered increased memory and processing capabilities over the old mission computer.
- Replacement of the old Stores Management System with the Smith Aerospace AN/AYQ-9 Stores Management System. This upgrade is considered an important element of the upgrade as it makes the CF-18 more compatible with the latest of precision guided munitions and furthermore adds the MIL-STD-1760 interface which is required for firing the AIM-120 AMRAAM missile.
- Furthermore, a Global Positioning System/Inertial Navigation System (GPS/INS) capability was installed on the CF-18 which enhances navigational capabilities of the CF-18.
Within the same time frame, other upgrades not in the scope of the IMP were also conducted:
- A new infrared sensor was installed on the aircraft.
- The old cathode ray tube cockpit instrument panels were replaced with new flat paneled, full colour LCD displays from Litton Systems Canada (now Northrop Grumman Canada).[3]
- A new night vision imaging system was added to the aircraft.
- Purchase of the AIM-120 AMRAAM medium range missiles and other advanced air to air and air to ground munitions.
- A landing-gear “get well” program to reduce corrosion and improve gear retraction.
- An Advanced Distributed Combat Training System.
The first completed "Phase I" CF-18 was delivered to the Canadian Forces on time in May 2003.[4] Final delivery of all "Phase I" CF-18's was done at a ceremony on August 31, 2006 at L-3 Communications in Mirabel, Quebec.[5]
Phase II of the CF-18 Incremental Modernization Project was award to Boeing on February 22, 2005, which consists of the following upgrades:
- The addition of a Link 16 data net system to the aircraft, enhancing interoperability with major NATO allies.
- The integration of the Joint Helmet Mounted Cuing System from Rockwell Collins and Israel’s Elbit Systems.*
- A crash survivable flight data recorder.
- An upgraded electronic warfare suite.
Within the same time frame, other upgrades not in the scope of the IMP are also planned:
- A fuselage Centre Barrel Replacement Project (for 40 of the upgraded aircraft).
- An Air Combat Manoeuvring Instrumentation System.
- An Integrated Electronic Warfare Support Station.
- An Electronic Warfare Test Equipment Project.
The first completed "Phase II" CF-18 was delivered to the Canadian Forces on August 20, 2007, at a ceremony in Montreal.[6]
Completion of the final phase of the CF-18 Incremental Modernization Project is expected to be in 2009. Total costs of the entire CF-18 Incremental Modernization Project and additional Hornet upgrades is expected to be around $2.6 billion dollars Canadian.[7][8]
[edit] Variants
- CF-18A : Single-seat fighter and ground attack aircraft. Canadian Forces designation CF-188A.
- CF-18B : Two-seat training version. Canadian Forces designation CF-188B.
[edit] Fleet
| This section does not cite any references or sources. (December 2007) Please help improve this section by adding citations to reliable sources. Unverifiable material may be challenged and removed. |
- Year(s) procured: 1982 to 1988
- Originally Ordered: 98 CF-18A / 40 CF-18B
- Current strength: 98 (80 in operational use). 121 Airframes available.
Planned allocation is two operational squadrons of 24 aircraft each, with the remaining 33 available for training, testing and evaluation AETE, and depot level maintenance.
- Operational readiness: Of the 48 aircraft in operational squadrons, 34 (70%) are normally mission-ready on a daily basis.
- Operational lifetime: The Canadian Forces expect the Hornet to maintain front-line status until 2017 to 2020, and also expect losses at an average rate of one aircraft every two years.
- Serial numbers: 188701 to 188798 (CF-18A), and 188901 to 188940 (CF-18B)
- Location(s):
- 3 Wing CFB Bagotville, Quebec
- 425 Alouette Tactical Fighter Squadron
- 4 Wing CFB Cold Lake, Alberta
- 409 Nighthawks Tactical Fighter Squadron
- 410 Cougars Tactical Fighter (Operational Training) Squadron
- AETE (Aerospace Engineering Test Establishment)
- Rotations from Cold Lake occur from 4 Wing to CFB Comox, British Columbia and from 3 Wing Bagotville to CFB Goose Bay and CFB Gander, Newfoundland and Labrador, CFB Greenwood, Nova Scotia, and various forward operating bases in the Canadian Arctic. There are normally a few aircraft at CFB Trenton as well, though not a permanent squadron.
- Cost: US$35 million each in 2003.[citation needed]
[edit] Losses
| This section needs additional citations for verification. Please help improve this article by adding reliable references. Unsourced material may be challenged and removed. (December 2007) |
- April 12, 1984: Aircraft crashes while performing an exercise at CFB Cold Lake. Pilot killed.
- June 4, 1985: Aircraft flown by the CO of 409 Squadron crashes on formation takeoff from CFB Cold Lake. Planes were on the way to CFB Baden-Soellingen. Pilot survives.
- May 24, 1986: Aircraft crashes in shallow water of Malpeque Bay after takeoff from CFB Summerside. Pilot (Captain Tristan deKoninck) killed
- May 4, 1987: Aircraft crashes after going into a tailspin during test flight near Renchen, Germany. Both crew members eject safely and survive.
- September 21, 1987: Aircraft crashes after left engine catches fire on take-off from CFB Bagotville. Pilot ejects safely.
- October 20, 1987: Aircraft skids into field and disintegrates after pilot tries to abort formation takeoff from RAF Alconbury. Pilot survives.
- April 5, 1988: Aircraft crashes into hillside on Vancouver Island on a search and rescue mission. Pilot killed.
- January 11, 1989: Aircraft crashes near CFB Cold Lake on airlift support mission. Pilot killed.
- January 30, 1990: Plane crashes after takeoff from Inuvik, Northwest Territories, on a cruise-missile intercept exercise. Pilot (Captain Rich Corver) killed.
- April 4, 1990: Aircraft crashes in Cold Lake Air Weapons Range near CFB Cold Lake. Pilot killed.
- April 17, 1990: Two CF-18's from CFB Baden-Soellingen collide while on a training mission in Germany. One crew member killed, other ejects safely.
- April 22, 1990: Aircraft plunges into Pacific Ocean during exercise off Vancouver Island. Pilot (Captain Hollis Tucker) killed.
- June 15, 1995: Aircraft crashes near Klamath Falls (US ANG Base), Oregon, while on a training exercise. Pilot ejects safely.
- July 5, 1995: Aircraft from CFB Cold Lake crashes in Saskatchewan during training. Pilot Capt. Richard Bailey of Vernon, BC killed.
- August 14, 1996: Aircraft crashes on takeoff from Iqaluit, Nunavut. Pilot safely ejects.[1]
- May 26, 2003: Jet crashes on the Cold Lake Air Weapons Range during the annual international training exercise MAPLE FLAG. Pilot (Captain Kevin Naismith) killed.[2][3]
- June 19, 2004: Aircraft from CFB Cold Lake lost when it was unable to stop while at Yellowknife, Northwest Territories. Aircraft was salvaged and is back in service. Pilot ejects but is injured.[4]
- August 16, 2005: Aircraft crashes during a training exercise near CFB Bagotville. Pilot safely ejects.[5]
[edit] Specifications (CF-18)
Data from CF-18 Specifications[9]
General characteristics
- Crew: 1 or 2
- Length: 56 ft 0 in (17.07 m)
- Wingspan: 40 ft 0 in with Sidewinders (12.31 m)
- Height: 15 ft 4 in (4.66 m)
- Wing area: 400 ft² (37.16 m²)
- Airfoil: NACA 65A005 mod root, 65A003.5 mod tip
- Empty weight: 23,049 lb (10,455 kg)
- Loaded weight: 37,150 lb (16,850 kg)
- Max takeoff weight: 51,550 lb (23,400 kg)
- Powerplant: 2× General Electric F404-GE-400 turbofans, 16,000 lbf (71.2 kN) each
Performance
- Maximum speed: Mach 1.8 (1,127 mph, 1,814 km/h) at 36,100 ft (11,000 m)
- Combat radius: 330 mi (290 nmi, 537 km) on hi-lo-lo-hi mission
- Ferry range: 2,070 mi (1,800 nmi, 3,330 km) (range without ordnance)
- Service ceiling 50,000 ft (15,000 m)
- Rate of climb: 50,000 ft/min (254 m/s)
- Thrust/weight: 0.89
Armament
- Nine Weapon/ Store Stations (5 pylons: 1 Under Fuslage and 4 Wing Stations) (2 LAU 116 located on sides of fuslage: deploys AIM 7 Sparrow and AMRAAM Missiles)(2 LAU 7 located on the wing tips: Deploys AIM 9 Sidewinder Missile), carrying up to 13,700 lb (6,215 kg) of missiles, rockets, bombs, fuel tanks, and pods
- 1x 20 mm M61A1 Vulcan internal gatling gun with 578 rounds, with firing rate of 4000 or 6000 shots per minute
- Missiles:
- Air-to-air: AIM-9 Sidewinder, AIM-120 AMRAAM, AIM-7 Sparrow
- Air-to-ground: AGM-65 Maverick, CRV7 rockets
- Bombs: Paveway, Mk 82, Mk 83, Mk 84, GBU-10, -12, -16 and -24 laser guided bombs.
Avionics
- Raytheon AN/APG-73 radar
- BAE Systems AN/APX-111 IFF
- Rockwell Collins AN/ARC-210 RT-1556/ARC VHF/UHF Radio
- General Dynamics Advanced Information Systems AN/AYK-14 XN-8 mission computer
- Smiths Aerospace AN/AYQ-9 Stores Management System
[edit] See also
Related development
Comparable aircraft
Related lists
[edit] References
- ^ The CF18 Hornet fighter aircraft – In Detail (Part 3).
- ^ Spick, Mike. The Great Book of Modern Warplanes. St. Paul, Minnesota: MBI Publishing Company, 2000. ISBN 0-7603-0893-4.
- ^ Boeing Awarded Contract with Canada to Update Displays on F/A-18s.
- ^ Boeing Delivers First CF-18 Aircraft from Modernization Project.
- ^ Boeing Completes First Phase of CF-18 Aircraft Modernization Project.
- ^ Air Force receives first Phase II modernized CF-18 fighter jet.
- ^ Canada's Air Force, Aircraft: CF-18 Hornet:Future Plans.
- ^ CASR - The CF18 Incremental Modernization Program – In Detail.
- ^ CF-18 Technical Specifications, Canada's Air Force. Retrieved February 6, 2008.
- CASR - The CF18 Hornet fighter aircraft – In Detail.
- CASR - The CF18 Incremental Modernization Program – In Detail.
- Canada's Air Force, Aircraft: CF-18 Hornet.
- Boeing.com - F/A-18 Hornet.
- Boeing.com - F/A-18E/F Super Hornet.
- Canada's Air Force, Aircraft: CF-18 Hornet: History.
- Jenkins, Dennis R. F/A-18 Hornet: A Navy Success Story. New York: McGraw-Hill, 2000. ISBN 0-07-134696-1.
[edit] External links
- Canada's Air Force CF-18 Hornet page
- Canada's Air Force - CF-18 Hornet Wallpaper
- "First upgraded CF-18 delivered to Canadian customer", Boeing, August 21, 2007. (Phase II modernisation)
|
||||||||||||||||||||||||||
|
|||||
|
||||||||||||||

