Carnarvonshire Railway

From Wikipedia, the free encyclopedia

Carnarvonshire Railway
LUECKE
- - Cambrian Railway (to Porthmadog)
eBHF
Afonwen
xABZlf STRlg
exSTR LUECKE
- - Cambrian Railway (to Pwllheli)
exBHF
Chwilog
exBHF
Llangybi
exBHF
Ynys
exBHF
Bryncir
exKBFa exSTR
Nantlle
exSTRlf exABZlg
Nantlle Branch Junction
exBHF
Penygroes
exBHF
Groeslon
exBHF
Llanwnda
HLUECKE STRlg exSTR
- - Welsh Highland Railway
BHF exBHF
Dinas Junction
STRlf xABZlg
exKBFa STR
Llanberis
exBHF STR
Cwm-y-Glo
exBHF STR
Pontrhythallt
exBHF STR
Pont Rug
exSTR eABZrg exHLUECKE
Quay Sidings
exSTR xKBFe
Caernarfon (WHR opened 1997)
exTUNNEL2 exTUNNEL2
exSTRlf exABZlr exSTRrf
exBHF
Caernarfon
exBHF
Griffiths Crossing
exBHF
Port Dinorwic
exHLUECKE exKRZu exKDSl
- - Padarn Railway
exABZrg exKDSl
Port Siding
exTUNNEL1
Vaynol Tunnel
exBHF
Treborth
exSTR LUECKE
- - North Wales Coast Line (to Holyhead)
xABZrg STRrf
eBHF
Menai Bridge
LUECKE
- - North Wales Coast Line (to Bangor)

The Carnarvonshire Railway was a railway connecting Caernarfon railway station (L&NWR) (terminus of the Bangor and Caernarvon Railway line from Bangor) with Afon Wen. It was later operated by the LNWR then the LMS. At Afon Wen, a junction connected with the Cambrian Line (GWR) to Pwllheli in one direction and to Porthmadog in the other, with LNWR/LMS running rights to both. The line had two branches, one from Caernarfon to Llanberis, which was built by the Carnarvon to Llanberis Railway and the other from Penygroes to Talysarn (Nantlle), which formed part of the narrow gauge Nantlle Railway, which between Penygroes and Caernarfon had been incorporated into the Carnarvonshire Railway. Regular passenger service on the Llanberis branch ceased in the 1930s (but summer passenger excursions from Llandudno etc. continued until the 1960s). Likewise the Talysarn branch passenger service ceased early. The remaining lines and services were shut completely as part of the Beeching Axe as follows:

  • Afon Wen to Caernarfon - December 1964
  • Llanberis to Caernarfon - December 1964
  • Caernarfon to Menai Bridge (Bangor) - January 1970.

Following the Britannia Bridge fire in 1970, the Menai Bridge to Caernarfon line was temporarily reopened to handle container traffic for Holyhead. This traffic ceased and the line closed again in January 1972.

A section of the line, from Caernarfon to Dinas, was incorporated into the reopened narrow gauge Welsh Highland Railway as the first phase of the line, in 1997. Several miles of the trackbed southwards from Dinas have been used to improve the A487 road. Some original sections remain and have been used as part of National Cycle Route 8.

The cycle route (Lôn Eifion) and the narrow gauge railway share the old trackbed south of Caernarfon to Dinas.