Broxbourne railway station

From Wikipedia, the free encyclopedia

Broxbourne
Location
Place Broxbourne
Local authority Broxbourne (borough)
Operations
Station code BXB
Managed by National Express East Anglia
Platforms in use 4
Live departures and station information from National Rail
Annual Rail Passenger Usage
2004/05 * 1.367 million
2005/06 * 1.334 million
History
Key dates Opened 1840
National Rail - UK railway stations

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z  

* Annual passenger usage based on sales of tickets in stated financial year(s) which end or originate at Broxbourne from Office of Rail Regulation statistics.
Portal:Broxbourne railway station
UK Railways Portal
West Anglia
Main Line

Cambridge
Shelford
Whittlesford Parkway
Great Chesterford
Audley End
Newport
Elsenham
Stansted Mountfitchet
Bishop's Stortford
Sawbridgeworth
Harlow Mill
Harlow Town
Roydon
Broxbourne
Cheshunt
Tottenham Hale
Liverpool Street

Broxbourne railway station, opened in 1840[1], serves Broxbourne in Hertfordshire, England. It is on the West Anglia Main Line, and train services are provided by National Express East Anglia, who also manage the station.

Contents

[edit] History

Broxbourne Station was officially opened by the Northern and Eastern Railway on 15 September 1840. It was on their proposed line to Cambridge, but the next section of the line to Latton Mill (Harlow) was not opened until August 1841. Therefore for a short period of time Broxbourne served as the terminus for the line which ran up the Lea Valley from Stratford Junction where it joined the Eastern Counties Railway. The station was moved from its original site in Station Road to the present site in 1959.

[edit] Service

The typical Monday-Saturday off-peak service from the station is:

(Passengers can also reach Stansted Airport by taking either Cambridge service and changing at Harlow Town.)

On Sundays the off-peak service is:

  • 2 tph to London Liverpool Street, of which:
  • 1 tph to Hackney Downs, calling at all stations as per the slow Liverpool Street layout just above and taking 29 minutes. This service does continue to Liverpool Street but is overtaken by the fast service and should not be used for that purpose.
  • 1 tph to Stratford, calling at Cheshunt, Waltham Cross, Enfield Lock, Brimsdown, Ponders End and Tottenham Hale, taking 32 minutes.
  • 2 tph to Hertford East as above, taking 18 minutes.
  • 2 tph to Cambridge, of which:
    • 1 calls at Harlow Town, Sawbridgeworth, Bishop's Stortford, Audley End and Whittlesford Parkway, taking 50 minutes.
    • 1 calls at all stations as per the second Cambridge layout above, and then Shelford (after Whittlesford Parkway), taking 61 minutes.

[edit] Gallery

[edit] References

  1. ^ The Industrial History of Broxbourne

[edit] External links

  Preceding station     National Rail     Following station  
Cheshunt   National Express East Anglia
West Anglia Main Line
  Roydon
  National Express East Anglia
Hertford East Branch Line
  Rye House